STEP #3 INSTALL FRAME COMPONENTS
A. From pages 12, 13, and 14, repeat steps 1 and 2. Set each successive frame into the
opening, snapping the verticals and fillers at each frame-until all frames are installed up
to the last frame at the opposite jamb.
B. Check frequently to ensure the installed framing is in the proper position with regard to
established benchmarks.
See Section III of the
Standard Installation
Instructions for special
sealant note at horizontals.
‘M’ ANCHOR
‘M’ ANCHOR
NOTE: On long runs, check overall frame dimensions at every fifth opening to avoid
dimensional build-up. The commercial cut length tolerance is +/- 1/16”. It is critical
to check every fifth unit for location relative to established benchmarks.