P3 general information – Oldcastle BuildingEnvelope 3000 XT Series User Manual

Page 3

Advertising
background image

3

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

GENERAL INFORMATION

The Oldcastle BuildingEnvelope Series 3000 XT (2 x 4 ½) system represents the latest in product

development technology complemented by dealer on -the-job input and experience. Proper use of this

system will assure optimum results in erection and long -term performance.

Oldcastle BuildingEnvelope does not control the application nor selection of its product configurations,

sealant, or glazing materials and assumes no responsibility thereof. It is the responsibility of the owner,

architect and installer to make these selections are in strict compliance with applicable laws and

building codes.

Over the years many components were added to our flush glaze systems. In addition, there are many

ways to install storefront products. This manual represents recommendations for the best results.

PROTECTION AND STORAGE:

Handle the material carefully. Do not drop from the truck. Stack with adequate separation so that the

material will not rub together. Store material off the ground. Protect against the elements and other

construction hazards by using a well -ventilated coveri ng. Remove material from package if it is wet or

is located in a wet area.

CHECK MATERIAL:

Check all material upon arrival for quality and to assure against shipping damage. Any visible damage

must be noted on the freight bill at the time of receipt. If a claim is required, then the receiving party

must process a claim with the freight company.

Completely check construction, which will receive your materials against contract documents. Notify

general contractor by letter of any discrepancies before proceeding with work. Failure to do so

constitutes acceptance of work by other trades.

Check shop drawings and installation instructions to become familiar with the project. The shop

drawings take precedence and include specific details for the project. The i nstallation instructions are

of a general nature and cover the most common conditions. Due to varying job conditions, all sealants

used should be approved by the sealant manufacturer, to insure they will function for conditions shown

on instructions and shop drawings. They must be compatible with all surfaces in which adhesion is

required, including other sealant surfaces. Use primers where directed by manufacturer of sealant. Be

sure to properly store sealants at recommended temperatures and check sealant for remainder of shelf

life before using.

FIELD CONDITIONS:

Do not install wall if there is a walkway with a down slope towards an entrance or a storefront.

All materials to be installed plumb, level and true. Aluminum to be placed in direct contact

with the masonry or incompatible materials should be isolated with a heavy coat of zinc -

chromate or bituminous paint.

After sealant is set and a representative amount of wall has been glazed (250 square feet of

more), run a water hose to check installation. On large jobs, hose test should be repeated

during glazing operation. Test should be conducted in accordance with AA MA 501.2

specifications.

Coordinate protection of installed materials with general contractors and other trades.

MAY 2013

S E R I E S 3 0 0 0 X T - I N S T A L L A T I O N M A N U A L

Advertising