TEST RUNNING

Perform the electric safe check after completing installation:
1. Grounding work
After finishing grounding work, measure the grounding resistance by visual detection and
grounding resistance tester. Make sure the grounding resistance is less than 4

.

2. Electrical leakage check (performing during test running)
During test operation after finishing installation, the serviceman can use the electroprobe
and multimeter to perform the electrical leakage check. Turn off the unit immediately if
leakage happens. Check and find out the solution ways till the unit operate properly.

A: Lo packed valve B: Hi packed valve
C and D are ends of indoor unit connection.

CAUTION

Indoor unit
check point

D

B

C

A

Outdoor unit
check point

Cover

Fig.22

Electrical safety check

Gas leak check

1. Soap water method:

Apply a soap water or a liquid neutral detergent

on the indoor unit connections and outdoor unit
connections by a soft brush to check for leakage
of the connecting points of the piping. If bubbles
come out, it indicates that the pipes have leakage.

2. Leak detector
Use the leak detector to check for leakage.

TEST RUNNING

3.Safety and leakage check

Perform test operation after completing gas leak check at the flare nut connections and
electrical safety check.
Check that all tubing and wiring have been properly connected.
Check that the gas and liquid side service valves are fully open.
1. Connect the power, press the ON/OFF button on the remote controller to turn the unit on.
2. Use the MODE button to select COOL, HEAT, AUTO and FAN to check if all the functions
works well.

O

3. When the ambient temperature is too low(lower than 62 F), the unit cannot be controlled by
the remote controller to run at cooling mode, manual operation can be taken. Manual
operation is used only when the remote controller is disable or maintenance necessary.

4. The test operation should last about 30 minutes.

The manual control button is on the bottom of the unit as shown in the picture.

One press

of the manual control button will lead to the forced AUTO operation. If press the button
twice within five seconds, the unit will operate under forced COOL operation(see User
Manual for details).

When relocate the unit to another place,
perform evacuation using vacuum pump.
Make sure the refrigerant added into the air
conditioner is liquid form in any case.
(Not applicable to the units adopt freon R22 )

Open the valve stem until it hits against the
stopper. Do not try to open it further.
Securely tighten the valve stem cap with a
spanner or the like.
Valve stem cap tightening torque (See
Tightening torque table in previous page ).

Outdoor
unit

Indoor
unit

Refrigerant

Flare nut

Stopper

Cap

Valve body

Packed valve

Half union

Gas side

Liquid side

A

C

D

B

Valve stem

Fig.19

Fig.20

2.When Using the Vacuum Pump

(For method of using a manifold valve, refer
to its operation manual.)
1. Completely tighten the flare nuts, A, B, C, D,
connect the manifold valve charge hose to a
charge port of the low-pressure valve on the
gas pipe side.
2. Connect the charge hose connection to the
vacuum pump.
3. Fully open the handle Lo of the manifold valve.
4. Operate the vacuum pump to evacuate. After
starting evacuation, slightly loose theflare nut
of the Lo valve on the gas pipe side and
check that the air is entering(Operation noise
of the vacuum pump changes and a
compound meter indicates 0 instead of minus)
5. After the evacuation is complete, fully close
the handle Lo of the manifold valve and stop
the operation of the vacuum pump. Make
evacuation for 15 minutes or more and check
that the compound meter indicates

5

-76cmHg (-1x10 Pa).
6. Turn the stem of the packed valve B about

o

45 counterclockwise for 6~7 seconds after
the gas coming out, then tighten the flare nut
again. Make sure the pressure display in the
pressure indicator is a little higher than the
atmosphere pressure.
7. Remove the charge hose from the Low
pressure charge hose.
8. Fully open the packed valve stems B and A.
9. Securely tighten the cap of the packed valve.

Fig.21

Caution in handling the packed valve

Manifold valve

Compound meter

-76cmHg

Handle Lo

Handle Hi

Charge hose

Charge hose

Vacuum pump

Pressure gauge

Low pressure valve

OUTDOOR UNIT INSTALLATION

Manual control

button

AUTO/COOL