Tjernlund VP-2F, VP-3F Airotronics Timer 8504140 Rev A 11/11 User Manual

Page 2

Advertising
background image

Tjernlund Products welcomes your comments and questions. Address all correspondence to: Customer Service,
Tjernlund Products Inc., 1601 Ninth Street, White Bear Lake, MN 55110-6794 or email us at [email protected].

TABLE OF CONTENTS

In The Event of a Pilot Outage ........................................................................................................................................1

Typical Installation ...........................................................................................................................................................2

Sequence of Operation ...................................................................................................................................................2

Installation Restrictions....................................................................................................................................................3

Actuation and Safety Controls Installation ......................................................................................................................3

Gas Pressure Switch ...................................................................................................................................3 - 4

Linear Limit Spillage Sensing Switch ................................................................................................................4

Thermocouple Junction Adapter .......................................................................................................................5

Vent Hood .......................................................................................................................................................................5

Code Restrictions & Termination Clearances ...................................................................................................5

Vent Hood Installation .......................................................................................................................................6

Power Venter Installation.................................................................................................................................................6

Code Requirements and Installation Restrictions ............................................................................................ 6

Power Venter Installation .............................................................................................................................6 - 7

Electrical Connections .....................................................................................................................................................7

Control Cord Routing.................................................................................................................................. 7 - 8

Actuation and Safety Control Circuit Connections............................................................................................8

Operation Circuit Check ..................................................................................................................................................8

Safety Interlock Test ........................................................................................................................................................8

Ladder Wiring Diagram ...................................................................................................................................................9

Combustion Air Test.........................................................................................................................................................9

Performance Curves......................................................................................................................................................10

Troubleshooting Guide ...........................................................................................................................................11 - 12

Maintenance ..................................................................................................................................................................13

How to Obtain Service Assistance & Warranty .............................................................................................................13

Replacement Parts List .................................................................................................................................................13

Vent Hood Mounting Template ......................................................................................................................................14

IN THE EVENT OF PILOT OUTAGE

1. Push the reset button in the center of the Linear Limit spillage sensing located on

the draft hood on the top of the water heater.

2. Turn the gas pilot knob at the top of water heater gas valve to “OFF” position.

WARNING: Gas pilot knob MUST REMAIN IN “OFF” POSITION FOR FIVE
MINUTES
BEFORE PILOT IS RE-LIT. Perform steps 3 & 4 while waiting.

3. Visually verify that there is 115 volt power established to the Power Venter.

Check fuse or circuit breaker, wall plug and electrical connections.

4. Visually verify that all electrical connections of control cord circuit are intact.

5. Follow water heater manufacturer’s re-lighting instructions attached to water

heater or located in water heater owner’s manual.

USER NOTE:
Since the Power Venter cannot operate during a power outage, the safety interlock controls are designed to prohibit gas flow to the
water heater. Follow the above procedures and water heater manufacturer’s instructions for relighting the pilot when power has been
restored.

1

Advertising