Diagram d, Typical installation – Tjernlund VP-2F, VP-3F Airotronics Timer 8504140 Rev A 11/11 User Manual

Page 9

Advertising
background image

ACTUATING AND SAFETY CONTROL CIRCUIT CONNECTIONS

1. If not previously completed, push both leads from the Linear Limit

spill switch onto Thermocouple Junction Adapter terminal, (See
Diagram C, Page 5). NOTE: On 750 Millivolt (power pile) heaters,
wire Linear Limit spill switch in series with high limit (ECO) of heater.

2. Push the Red lead from Power Venter 25’ control cable onto the

common on the Gas Pressure Switch, (See Diagram D)

3. Push the Blue lead from the Power Venter 25’ control cable onto

the normally open terminal on the Gas Pressure Switch, (See Diag. D).

4. Plug the power cord from the Power Venter into a grounded 115

VAC outlet. Verify that the outlet is powered through a 15 amp
circuit breaker.

NOTE: The Power Venter may operate for approximately 45 seconds when power is first

established. Wait until the Power Venter shuts off before continuing.

OPERATION CIRCUIT CHECK

1. Place water heater in operation.

A. The Power Venter should operate.

2. Turn gas pilot knob to “pilot”.

B. The Power Venter should continue to operate for approximately 45 seconds to purge the vent system of any residual flue gases.

3. Repeat steps 1 and 2 twice to assure operation.

SAFETY INTERLOCK TEST

IMPORTANT:
The Linear Limit spillage sensing switch must disable the heater in the event of a venting malfunction. The following procedure is
necessary to confirm that the heater is disabled in the event of a venting malfunction.

1. Unplug Power Venter from 115 VAC outlet to disable the Power Venter.

2. Adjust the heater’s thermostat or run hot water until full burner operation occurs. Venter should not run, but burner should fire.

3. Flue gas spillage will emit from the draft hood. Linear Limit spillage sensor should open in less than 3 minutes, extinguishing pilot

light and disabling water heater. If water heater is not disabled, remove call for heat, reposition Limit and repeat steps 1-3.

4. Wait 2-3 minutes for Linear Limit sensing element to cool and push the reset button on Linear Limit spillage sensing switch.

5. Plug Power Venter power cord back into 115 VAC outlet.

6. Re-light pilot following the heater manufacturer’s instructions. Adjust the heater’s thermostat or run hot water until full burner opera-

tion occurs. Power Venter should now be running while burner is firing. Turn thermostat down or hot water off so burner is no
longer firing. Power Venter should continue to run for approximately 45 seconds during the Relay/Timer post-purge cycle.

8

BLUE WIRE FROM
VP-2F / VP-3F

RED WIRE FROM

GAS PRESSURE
SWITCH

CONTROL CABLE

CONTROL CABLE

VP-2F / VP-3F

8050012 11/30/11

NOTE: The installer must ensure that

all electrical connections are tight.

WITH THE ECO OF THE WATER HEATER.

REQUIRED. WIRE THE LINEAR LIMIT IN SERIES

THE THERMOCOUPLE JUNCTION ADAPTER IS NOT

ON 750 MILLIVOLT (POWER PILE) HEATERS

THERMOCOUPLE JUNCTION ADAPTER

PRESSURE TAP

FROM THERMOSTAT

6' LINEAR
LIMIT LEADS

115/1/60

NAMEPLATE

MOTOR

VENTER

POWER

SWITCH

GAS PRESSURE

GAS PRESSURE SWITCH

ALUMINUM TUBING TO

24" LONG 1/4" O.D.

LINE

GAS SUPPLY

BY OTHERS

WATER HEATER

BY OTHERS

THERMOSTAT

LINE

GAS PILOT

8050013 11/30/11

CLIPS

ROUTING

CABLE

THERMOSTAT CABLE

2 WIRE JACKETED

POWER

6 FOOT

BY OTHERS

FLUE PIPE

SWITCH SET AT 185°F

SPILLAGE SENSING

LINEAR LIMIT

GAS PRESSURE

TAP PORT

NOTE:

CORD

TJERNLUND
VENT HOOD

TYPICAL INSTALLATION

DIAGRAM D

NOTE: The installer must install the Power

Venter downstream of the draft hood.

Advertising