Diagram i – Tjernlund VSUB Series Universal Blowers for Combustion Air or Draft  8504114 User Manual

Page 10

Advertising
background image

9

3. Lock in place with compression nut. With the VSUB Blower on, a positive pressure reading on a draft gauge is an indication that

the tube has been orientated properly.

4. Fan Proving Switch diaphragm must be mounted in a VERTICAL position within six feet of the sensing location. Firmly insert flexi-

ble tubing on sampling tube and Fan Proving Switch fitting marked (HIGH). Leave the other Fan Proving Switch port open to room
atmosphere for reference. Make sure there are no sharp bends or kinks in flexible tubing. Do not mount the PSA-1 so that is direct-
ly in the path of the VSUB Blower discharge, unit heater or duct discharges. Doing so may cause a false reference pressure reading.

WIRING

All wiring from the VSUB Blower to the appliance must be in compliance with local codes or in their absence, the National Electric
Code (NFPA 70).

All wiring from the VSUB Blower to the appliance must be appropriate class 1 wiring as follows: Installed in rigid metal conduit, inter-
mediate metal conduit, rigid non-metallic conduit, electrical metallic tubing, Type M1 cable or be otherwise suitably protected from
physical damage.

IMPORTANT:
All wiring from the VFD Variable Frequency Drive or CPC-2 constant Pressure Controller must be in metal conduit or shield-
ed cable where appropriate. Do not route these wires with any other wires. Improper system operation could result.

This installation manual does not contain any system design documentation. Installation and use of Tjernlund controls like the CPC-2
Constant Pressure controller, EXP-4 Appliance Interlock Expansion Boards, VFD-Series Variable Frequency Drives, UC1 Universal
Control, TD-2/TD-3 Pressure Transducer or MAC1E and MAC4E Multiple Appliance Controls are not covered by this manual. Please
refer to those accessory installation manuals.

WIRING VSUB MOTOR FOR PROPER VOLTAGE

IMPORTANT: CONFIRM PROPER IMPELLER ROTATION
If this VSUB Blower is being installed in conjunction with a CPC-2 Controller, follow impeller rotation check instructions outlined in the
CPC-2 installation instructions. Failure to insure correct rotation will result in higher power usage and poor blower performance.

All VSUB Blowers must use a Variable Frequency Drive (VFD) supplied by Tjernlund which is factory programmed specifically for the
VSUB model being installed.

VISUAL METHOD TO VERIFY PROPER ROTATION:
VSUB Series impeller must rotate counter-clockwise as viewed from the motor side, (See Diagram I). Verify motor cooling fan at back
of motor rotates counter-clockwise. While the VSUB Blower is running at a slow speed, starting up or coming to a stop, visually deter-
mine if the rotation is correct. Perform step 4 on page 10 if rotation is in the reverse direction.

MOTOR

WINDINGS

MOTOR

LIMIT

GROUND

P1

P2

BLACK

BLACK

BLACK

BLUE

ORANGE

GREEN

BLACK

BLACK

BLACK

BLUE

ORANGE

GREEN

VSUB MOTOR

4 x 4 WEATHERPROOF BOX

FLEXIBLE CONDUIT

WIRE NUTS BY INSTALLER

FACTORY CONNECTORS

IMPORTANT:

T4

T7

T1

T5

T8

T2

T6

T9

T3

BLACK

BLACK

BLACK

T4

T1

T5

T6

BLACK

BLACK

BLACK

T7

T2

T8

T3

T9

MOTOR WIRING

460 VOLT VFD

MOTOR WIRING

230 VOLT VFD

(FACTORY WIRING)

FIGURE 8055001 4/5/04

RED

RED

RED

RED

H2

H1

ARCTIC-DUTY

230 VAC OR 460 VAC

5 VDC BOARD-GENERATED

DO NOT SUPPLY POWER!

230 VAC

LEGEND:

POWER.

MOTOR HEATER

(15 WATTS FOR VSUB8,12,16

MOTOR HEATER T-STAT

460 VAC

BELOW FREEZING.

& 30 WATTS FOR VSUB20)

VSUB ROTATION 2/27/04

I

M

P

E

L

L

E

R

R

O

T

A

T

I

O

N

DIAGRAM I

Advertising