Powering up, Powering down – Vinten Radamec SE-500 Elevation Unit User Manual

Page 28

Advertising
background image

27

Powering up

Before powering up the servo elevation unit, make sure that the area around the unit is clear.

1.

Ensure the emergency STOP switch (Fig 2.4) on the control box is pressed.

2.

Turn on the power supply.

3.

Twist the emergency STOP switch clockwise to release it. The green PWR LED on the control box
will illuminate, the elevation unit will drive to its lowest position and the pan and tilt head will
initialise. The yellow DATA LED will only illuminate if the control system is operative and the
elevation unit and the pan and tilt head will then drive to their previous position.

Powering down

Always power down the head before the elevation unit.

1.

Press the STOP switch.

2.

Switch off and/or disconnect the SE-500 power supply if required.

WARNING!:At power up, the column and payload will drop to minimum height.
Ensure that no-one will be hit by the payload.

Advertising