Override operations – Carrier 19XL User Manual
Page 63
Advertising

Override Operations
To Override a Value or Status
1. On the Point Status table press NEXT or PREVIOUS to highlight the desired point.
2. Press SELECT to select the highlighted point. Then:
NEXT
PREVIOUS
SELECT
EXIT
NEXT
PREVIOUS
SELECT
EXIT
Click here for Figure 15 — Example of Point Status Screen (Status 01)
Advertising