Before initial start-up, Job data required, Equipment required – Carrier 19XL User Manual

Page 125

Advertising
background image

Before Initial Start-Up

Job Data Required

•

list of applicable design temperatures and pressures (product data submittal)

•

machine certified prints

•

starting equipment details and wiring diagrams

•

diagrams and instructions for special controls or options

•

19XL Installation Instructions

•

pumpout unit instructions

Equipment Required

•

mechanic’s tools (refrigeration)

•

digital volt-ohmmeter (DVM)

•

clamp-on ammeter

•

electronic leak detector

CAUTION

CAUTION

!

Do not reset starter loads or any other starter safety for 30 seconds after the
compressor has stopped. Voltage output to the compressor start signal is main-
tained for 10 seconds to determine starter fault.

Advertising