Stabilizing the system, Lifting the system – Cisco 4490 User Manual

Page 45

Advertising
background image

2-11

Cisco Global Site Selector 4490 Hardware Installation Guide

78-15755-02

Chapter 2 Preparing for Installation

Safety Guidelines

•

Ensure that cables from other equipment do not obstruct the airflow through
the chassis or impair access to the power supplies or cards. Route cables away
from field-replaceable components to avoid disconnecting cables
unnecessarily for equipment maintenance or upgrades.

Stabilizing the System

Observe the following general precautions to stabilize the system:

•

Install any stabilizers that came with your equipment rack before mounting
or servicing the system in the rack.

•

Load the rack from the bottom to the top, with the heaviest system at the
bottom.

•

Do not stack the system on top of any other equipment. If the system falls, it
can cause severe bodily injury and damage the equipment.

•

If you are using an equipment shelf, ensure that the shelf is constructed to
support the weight and dimensions of the chassis.

•

If you are using a telco rack, ensure that the weight of the chassis does not
make the rack unstable. Secure the telco rack with ceiling brackets if the rack
is populated with heavy equipment.

•

Bolt the rack to the floor for stability.

Lifting the System

Observe the following general precautions when lifting the system:

•

Disconnect all power and external cables before lifting the system.

•

Ensure that your footing is solid and the weight of the system is evenly
distributed between your feet.

•

Lift the system slowly, keeping your back straight. Lift with your legs, not
with your back. Bend at the knees, not at the waist.

•

Depending on the weight of the system, more than one person might be
required to lift it.