6 .2 preparing for use, Caution, Warning – BUCHI Recirculating Chiller F-125 User Manual

Page 19

Advertising
background image

6 Operation

19

F-125 Manual, Version B

6 .2

Preparing for use

Prerequisites

All parts must be clean and free of damage.

•

Close the drain valve.

•

6 .2 .1

Install the Rotavapor

®

on top of the Chiller

For installation of the Rotavapor

®

on the Chiller you need a transportation specialist. You need at

least two people to lift the Rotavapor

®

onto the top of the Chiller Trolley. Mount four carry belts on the

Rotavapor

®

feet . Install one of them on each end. Check for proper seating of the belts. Now lift the

Rotavapor

®

evenly onto the Chiller Trolley.

!

CAUTION

Risk of minor or moderate injury due to the heavy weight of the instrument.

Utilize a second person to transport the instrument

•

Do not drop the instrument or its transport box

•

Place the instrument on a stable, even and vibration-free surface

•

Keep limbs out of crushing zone

•

6 .2 .2

Installing the hoses

!

WARNING

Stumbling or falling due to improper installation of the cables and hoses.

The length of the cables and hoses should be kept as short as possible

•

If possible, avoid installing cables and hoses in aisle areas

•

If installation of cables and hoses in aisle areas is unavoidable, use an adequate protective

•

pad in order to avoid the danger of stumbling and damage

Connect out flow and return flow connections of the Recirculating Chiller with the condenser of the

•

rotary evaporator.

NOTE
Only use hoses which can withstand min. -20 °C and 2 bar pressure and secure them with the usual
hose clamps.
Setup for a complete Rotavapor

®

system, includes second condenser on the Chiller and condenser

on the Rotavapor

®

:

Cooling medium flow IN / OUT for second condenser to the second condenser installed on the

•

Chiller.
Connect the main cooling medium flow OUT to the bottom inlet of the cooling coil of the

•

Rotavapor

®

.

Connect the main cooling medium flow IN to the top outlet of the cooling coil of the Rotavapor

•

®

.

See also section 5.2 “Cooling water routing”.

•