Hardy Advantage Weigh Modules LPB User Manual

Page 30

Advertising
background image

HI LPB SERIES LOAD POINT ASSEMBLY

Page 24

Remedy:

Step 1.

Tie together the load sensor excitation (2),
signal (2) and ground (1) wires.

NOTE:

Be careful NOT to include the two C2 wires.

Step 2.

Use a megohmmeter and measure the
resistance between all five wires tied
together and the load cell metal body. The
measured value should be 5,000 megohms
or more.

WARNING

WHEN USING A MEGGER DO NOT EXCEED
50 VOLT RANGE.

Step 3.

If the sensor fails this test remove the
ground wire and test with only the four
live leads.

Step 4.

If the sensor passes the test an insulation
problem in the cable is most likely.

Step 5.

Replace the load cell if the cell fails both
tests.

Electrical Termination
Cable Color Codes

The cable is 6 conductor, shielded (floating) and 10
feet in length.

EXC+

Red

EXC -

Black

SHIELD

Yellow

C2+

Gray

C2-

Violet

SIG +

Green

SIG -

White

Advertising