Hardy Floor Scales User Manual
Page 35
Advertising

Hardy Floor Scales
26
cable exit. Locate the conduit to match the
hole location.
Step 1.
Place the pit frame in the approximate
position it will occupy on the floor. (See
Fig. 21)
FIG. 21 FOUNDATION FOR THE PIT FRAME
Step 2.
Mark out the position of the hole to be
made. The hole MUST be a minimum of
12" larger than the pit frame on all sides.
(See Fig. 22)
11” (279.4mm)
3.4375 (87.3mm)
Advertising