1.2 Packaging and Shipping, Receiving and Inspection, Handling

and Storage

1.2.1 Packaging and Shipping: Unless otherwise defined in the

purchase order and agreed by AAF, the SAH filter housing and

filters are packaged for domestic transit and shipped FOB the AAF

factory. The method of shipment will be as specified in the

customer’s purchase order to AAF.

1.2.2 Receiving and Inspection: Obtain a copy of the purchase

order, the product drawing that was submitted by AAF in

association with the order, and a copy of the bill of lading, along

with any other shipping papers. Upon receipt of the equipment, or

any part thereof, these documents shall be used to ensure that the

correct product has been received.
For maximum protection, complete the following steps upon receipt

of the AAF Side Access Housing (SAH) and filters:

– Inspect the shipment and all associated documentation. Notify

the carrier immediately if there is any visible damage to the

packaging or the equipment, or a discrepancy in the shipping

papers and, if necessary, file an immediate claim with the carrier

against such damage or discrepancy.
– Confirm that the equipment received agrees with the contents

of the shipping papers.
– Confirm that the shipping documents agree with the purchase

order. Refer to the product drawing submitted for the order as

necessary.
– If it is determined that any equipment ordered on the purchase

order has not been delivered and is not accounted for in the

shipping papers contact AAF International immediately by calling

1-800-477-1214. Reference the AAF control number, which will

be listed on the shipping papers.

Each shipment may include:

– One or more individually packaged Side Access Housings (SAH).
– Packaged particulate filters.
– Packaged gas-phase chemical filter cassettes.
Note that the Side Access Housing (SAH) and the particulate and

gas-phase filters may ship from different locations and be received

at different times.

1.2.3 Handling and Storage: Following receipt, inspection, and

acceptance of the equipment, and prior to installation, the Side

Access Housing (SAH) and the particulate and gas-phase filters shall

be handled with great care. The Side Access Housing (SAH) ships

mounted on a pallet for protection during shipping and handling. It is

recommended that it remain on its pallet until it has been moved to

its final installation location. Only personnel experienced in rigging

and handling large equipment shall be employed for this task. Small

SAH’s may be moved using a forklift. A suggestion for rigging larger

equipment is shown in Figure 1. Rig the housing using straps or a

sling. Fasten the strapping under the skid on which the SAH ships.

To prevent damage to the exterior surface of the SAH use spreader

bars at all times. Position the spreader bars to keep the cables from

rubbing against any part of the housing. Before hoisting make sure

that the load is properly balanced.

A channel base is offered as an option with the SAH. Check to see if

this has been included. The channel base includes web openings for

the insertion of pipes for hoisting the equipment. See below for details.

! WARNING: The housing top will not support the weight of the

unit. Any attempt to support the housing from the top may result

in serious equipment damage and severe personal injury. Do not

walk on the top of the unit or use the top for storage of materials.

2

Figure 1

Optional channel base.

SAH

Straps

or sling

Shipping skid

Spreader bar

(multiple spreader bars

may be needed, depending

on size of unit)