Gf-120, Benchmark 1.5ln low nox boiler – AERCO BMK 1.5 LN October 2012 User Manual

Page 87

Advertising
background image


CHAPTER 7

MAINTENANCE

PR1: 10/18//12 AERCO International Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 87 of 166


GF-120

OMM-0041 0E

Benchmark 1.5LN Low NOx Boiler

Installation, Operation and Maintenance Manual

Disconnect the flex hose from the air/fuel valve by loosening the hose clamp.

13.

Remove the four (4) 5/16-18 hex head screws securing the blower to the burner plate

14.

(Figure 7-5).

Remove the blower and air/fuel valve from the burner plate by lifting straight up. Also,

15.

remove the blower gasket.

Remove the eight (8) 3/8-16 nuts from the burner flange (Figure 7-4) using a 9/16”

16.

wrench.

NOTE

The burner assembly is heavy, weighing approximately 25 pounds.

Remove the burner assembly from burner flange by pulling straight up.

17.

Remove and replace the two (2) burner gaskets.

18.

NOTE

During reassembly, apply high-temperature, anti-seize lubricant to the
threads of the igniter-injector and grounding screw. Also, ensure that the
igniter-injector is properly positioned as indicated in Figure 7-3. Torque the
igniter-injector to 15 ft-lbs.

Beginning with the burner assembly removed in step 17, reinstall all the components in

19.

the reverse order that they were removed.

Ensure that the igniter-injector and flame detector cutouts in the burner plate are

20.

properly aligned with the heat exchanger top flange.


Advertising