MAINTENANCE

7-6

4. Remove the float from the condensate trap.

5. Remove the orifice gasket from the trap.

6. Thoroughly clean the trap and gasket. Also

inspect the drain piping for blockage. If the
trap cannot be thoroughly cleaned, replace
the trap.

7. After the above items have been inspected

and thoroughly cleaned, replace the orifice
gasket and float in the condensate trap and
replace the trap cover.

8. Reassemble all piping and hose connections

to the condensate trap inlet and outlet.
Reconnect trap to exhaust manifold drain.

7.8 SHUTTING THE BOILER DOWN FOR
AN EXTENDED PERIOD OF TIME

If the boiler is to be taken out of service for an
extended period of time (one year or more), the
following instructions must be followed.

1. Set

ON/OFF switch on the front panel to the

OFF position to shut down the boiler’s
operating controls.

2. Disconnect AC power from the unit.

3. Close the water supply and return valves to

isolate boiler.

4. Close external gas supply valve.

5. Open relief valve to vent water pressure.

7.9 PLACING THE BOILER BACK IN
SERVICE AFTER A PROLONGED
SHUTDOWN

After a prolonged shutdown (one year or more),
the following procedures must be followed:

1. Review installation requirements included in

Chapter 2.

2. Inspect all piping connections to the unit.

3. Inspect exhaust vent, air duct (if applicable).

4. Perform initial startup per Chapter 4.

5. Perform safety device testing and scheduled

maintenance per Chapters 6 and 7.