Scheduling favorite reports – AltiGen MAXCS 7.0 Update 1 AltiReport User Manual
Page 26

22
AltiReport
Manual
Scheduling Favorite Reports
To schedule a favorite report to run automatically, check the Enable auto schedule
check box in the Add Favorite Report dialog box. The scheduling options appear:
Figure 27. Add favorite report dialog box with scheduling options
Set a schedule for the report. If you want the report e-mailed to specified people, list
their e-mail addresses in the Send Report to section. Separate e-mail addresses with
a semicolon ( ; ). Then click the Submit button.
Important:
When setting up a report schedule for a specific time, you must set
the schedule at least 15 minutes before the current time or the
report may not be generated/sent. For example, to run a report at
5:00 PM, you must set up the report schedule prior to 4:45 PM.
Later, you can change the schedule and e-mail list by clicking on the report’s Edit link
in the List All Favorite Reports screen. You can also change the report description and
view the report parameters.