Brackets front-mounted-chassis recessed in rack, Brackets front-mounted—chassis recessed in rack – Cisco 7200 VXR User Manual

Page 11

Advertising
background image

11

Figure 5

Attaching the Rack-Mount Brackets to the Front of the Chassis—Chassis Recessed

Brackets Front-Mounted—Chassis Recessed in Rack

Locate the rack-mount and cable-management brackets and screws and a Number 2 Phillips screwdriver.

Step 1

Align the cable-management bracket (1) to the side of the router. Align the rack-mount bracket over it—as shown
above—and insert and tighten the screws (3).

Go to the “Two-Post or Four-Post Rack Installation” section on page 16.

Step 2

If you are not using the cable-management brackets, align the rack-mount brackets (2)—as shown above—to the router
and insert and tighten the screws.

If you have an NPE-G1 or NPE-G2 installed, go to the “NPE-G1 and NPE-G2 Rear Cable-Management Brackets on a
Front-Mounted Router” section on page 12.

If you do not have an NPE-G1 or NPE-G2 installed, go to the “Two-Post or Four-Post Rack Installation” section on page 16.

1

Cable-management bracket

3

M4 x 8-mm Phillips flathead screws

2

Rack-mount bracket

2

ETHERNET-10BFL

E

N

R

X

0

1

2

3

4

TX

R

X

TX

R

X

TX

R

X

TX

R

X

TX

ETHERNET 10BT

EN

A

B

LE

D

0

2

1

3

LI

N

K

0

1

2

3

0

4

1

3

5

6

FAST SERIAL

EN

TD

TC

R

D

R

C

LB C

D

TD

TC

R

D

R

C

LB C

D

TD

TC

R

D

R

C

LB

C

D

TD

TC

R

D

R

C

LB C

D

EN

A

B

LE

D

M

II

L

IN

K

R

J45

FAST ETHERNET

0

TOKEN RING

0

1

2

3

ENABLED

IN-RING

4/16 Mbps

Cisco 7200

Series

FAST ETHERNET INPUT/OUTPUT CONTROLLER

ENABLED

PCMCIA

EJECT

SLOT 0

FE

ENABLEFE LINK

CPU RESET 1O POWER

OK

SLOT 1

FE MII

EN

53499

1

2

3

Advertising