Cisco Nexus 5000 Series Hardware Installation Guide

OL-15902-01

Appendix D Site Planning and Maintenance Records

Site Preparation Checklist

Table D-1

Site Planning Checklist

Task No. Planning Activity

Verified By

Time

Date

1

Space evaluation:

•

Space and layout

•

Floor covering

•

Impact and vibration

•

Lighting

•

Maintenance access

2

Environmental evaluation:

•

Ambient temperature

•

Humidity

•

Altitude

•

Atmospheric contamination

•

Air flow

3

Power evaluation:

•

Input power type

•

Power receptacles

1

•

Receptacle proximity to the
equipment

•

Dedicated circuit for power supply

•

Dedicated (separate) circuits for
redundant power supplies

•

UPS

2

for power failures

1.

Verify that the power supply installed in the chassis has a dedicated AC source circuit.

2.

UPS = uninterruptible power supply.

4

Grounding evaluation:

•

Circuit breaker size

•

CO ground (AC- powered systems)

5

Cable and interface equipment
evaluation:

•

Cable type

•

Connector type

•

Cable distance limitations

•

Interface equipment (transceivers)

6

EMI

3

evaluation:

•

Distance limitations for signaling

•

Site wiring

•

RFI

4

levels