Managing the devicemaster up, Rebooting the devicemaster up – Comtrol UP 16-Port User Manual

Page 29

Advertising
background image

DeviceMaster UP 16-Port Hardware User Guide: 2000596

Rev. B

Managing the DeviceMaster UP - 29

Managing the DeviceMaster UP

This section discusses the following DeviceMaster UP maintenance procedures:

Rebooting the DeviceMaster UP

Uploading Firmware to Multiple DeviceMaster UPs

on Page 30

Configuring Multiple DeviceMaster UPs Network Addresses

on Page 31

Note: You can configure the network addresses for multiple DeviceMaster

UPs, configure common settings for the DeviceMaster UPs, and save the
settings to a configuration file that you can use to load settings up to all
or selected DeviceMaster UPs.

Adding a New Device in PortVision DX

on Page 31

Using Configuration Files

on Page 33

.Managing Bootloader

on Page 35, which also discusses checking the

Bootloader version and downloading the latest Bootloader

Accessing RedBoot Commands in Telnet/SSH Sessions (PortVision DX)

on

Page 37

Note: You can optionally refer to

RedBoot Procedures

on Page 41 if you want to

perform procedures at the RedBoot level.

Rebooting the DeviceMaster UP

There are many ways to reboot the DeviceMaster UP.

Method

Procedure

PortVision DX

Right-click the DeviceMaster UP or DeviceMaster UPs in the
Device List pane, click Advanced >Reboot and then Yes.

Note: If security has been enabled in the web page, you will

need to reboot the DeviceMaster UP in the web page.

Web page

Main page (Server Status): Scroll to the bottom of the page,
click Reboot and then Yes: Reboot.

Telnet

Type reset.

Advertising