SERIES VF-100 SCREW FEEDER
4
If an adjustable mounting stand assembly is provided, the feeder is generally mounted
to the stand and the stand bolted to the skid package. Other accessories, such as
solution tanks, weigh platforms, extension hoppers, etc. will be bolted to skid
package(s) as required. To minimize potential shipping damage, controllers are shipped
separately via parcel service. Upon receipt of the skid package(s) from the common
carrier, inspect the package(s) for damage. All components should be securely mounted
to the skid(s). If a component has broken loose or the skid is damaged, check for
component damage. If the package itself is damaged, the contents may likewise be
damaged. If damage is evident, open the package immediately and check the contents. If
damage is evident, notify the carrier for credit and Eagle Microsystems for repair or
replacement of the equipment.
Note: If the package is damaged and no physical damage to the equipment is
apparent, write on the carrier’s paperwork “PACKAGE DAMAGED” to protect your
rights to collect for possible future discovered damage at startup. EAGLE MICRO-
SYSTEMS WILL ONLY REPAIR OR REPLACE DAMAGED GOODS FREE TO THE
CUSTOMER FOR MATERIAL REIMBURSED BY THE CARRIER.
B
. STORAGE:
If the equipment is not to be installed upon arrival at the job site, it is best to leave
the feeder mounted to its shipping skid indoors until such time as the feeder is ready
to be installed. If the temperature in this storage area is such that condensation may
develop in the drive controller package, the electronics package should be moved to
a temperature controlled environment. For extended storage, Eagle recommends
that delivery of the electronics be scheduled a week or so prior to the scheduled
installation date. The feeder should remain in its original packaging until installation.