12 blast chilling/deep freezing intensity – EVCO EVCSR818P9EF User Manual

Page 42

Advertising
background image

EVCO S.p.A.

Vcolor 818

| Installer manual ver. 1.1 | Code 144VC818E114

page 42 of 94

6.12

Blast chilling/deep freezing intensity

The device can manage the phase cut speed regulator for EVDFAN1 single phase fans (to be ordered separately); see

paragraph 15.1 “phase cut speed regulator for EVDFAN1 single phase fans”.

The regulator can be used to manage evaporator fan activities with a single analogue control, i.e. via the PWM

analogue output of the device and the regulator phase cut output (the digital output K3 is however activated).

Parameter F0 must be set at 3.

Parameters F18... F22 establish speed 1... 5 of the evaporator speed (intended as a percentage of the maximum

speed), parameter F23 establishes the speed at which the evaporator fan is switched on during post blast chilling

storage and parameter F24 establishes the speed at which the evaporator fan is switched on during post deep freezing

storage (the latter intended as one of the speeds 1... 5).

The following table illustrates the speeds at which the evaporator fan is switched on during the operating cycles.

A different speed can be selected using the procedure given in 6.12.1 (intended as one of the speeds 1.. 5) in

temporary mode (i.e. if a power cut occurs, on restore of the same the speeds illustrated in the following table will be

offered), except if the selection is made before starting a blast chilling and storage cycle or before starting a hard blast

chilling and storage cycle or before starting a soft deep freezing and storage cycle (in this case the speeds are

memorised instead).

Blast chilling

and storage

Hard blast

chilling and

storage

Deep freezing

and storage

Soft deep

freezing and

storage

Blast chilling hard phase

-

speed 5

-

-

Blast chilling

speed 1... 5 (can

be memorised

with the

procedure given

in paragraph

6.12.1 if selected

before starting

the operating

cycle)

speed 1... 5 (can

be memorised

with the

procedure given

in paragraph

6.12.1 if selected

before starting

the operating

cycle)

-

-

Deep freezing soft phase

-

-

-

speed 1... 5 (can

be memorised

with the

procedure given

in paragraph

6.12.1 if selected

before starting

the operating

cycle)

Advertising