Installation, Mechanical – FloAire INDIRECT FIRED BENT TUBE MODULE User Manual

Page 4

Advertising
background image

4

INSTALLATION

It is imperative that this unit is installed and operated with the designed airflow, gas, and electrical supply
in accordance with this manual. If there are any questions about any items, please call the service
department at 1-866-784-6900 for warranty and technical support issues.

Mechanical

WARNING: DO NOT RAISE VENTILATOR BY THE INTAKE HOOD, BLOWER OR
MOTOR SHAFT, OR BEARINGS – USE LIFTING LUGS PROVIDED OR A SLING

Site Preparation

1. Provide clearance around installation site to safely rig and

lift equipment into its final position. Supports must
adequately support equipment. Refer to manufacturer’s
estimated weights.

2. Consider general service and installation space when

locating unit.

3. Locate unit close to the space it will serve to reduce long,

twisted duct runs.

4. Do not allow air intake to face prevailing winds. Support

unit above ground or at roof level high enough to prevent
precipitation from being drawn into its inlet. The inlet must
also be located at least 10 feet away from any exhaust
vents. The heater inlet shall be located in accordance
with the applicable building code provisions for ventilation
air.

Assembly

Intakes and curbs are shipped unassembled to heater module.
Upon unit arrival, use the following procedure to assemble the
intake to the heater.

1. Apply silicone or weather-proof gasket on the back side of

the flanges of the intake hood or v-bank intake.

2. Screw the flanges of the intake hood or v-bank to the unit with the supplied sheet metal screws.

Place caulk on the outside
of the screws to prevent
water leaks. If the unit is a
modular unit with a v-bank
or

evaporative

cooler

section, the v-bank or
evaporative cooler will bolt
to the heater with the bolts
provided.

Curb and Ductwork

This fan was specified for a
specific CFM and static pressure.
The ductwork attached to this unit
will significantly affect the airflow
performance. Flexible ductwork

CLEARANCES

The top, back, and front
surfaces of this heater may not
be installed less than 6” from
combustible materials. The
heater base may be installed
on

combustible

surfaces.

Allow 24” minimum service
clearance on both sides of this
heater.

IMPORTANT

To prevent premature heat
exchanger

failure,

do

not

locate any gas fired unit in
areas

where

chlorinated,

halogenated, or acid vapors
are present in the atmosphere.

Advertising
This manual is related to the following products: