INSTALLATION

Check Equipment and Job Site

Unpack Unit

Move to final location. Remove carton taking care not to damage
unit.

Inspect Equipment

File claim with shipping company prior to installation if shipment

is damaged or incomplete. Locate unit rating plate on unit corner
panel. It contains information needed to properly install unit.

Check rating plate to be sure unit matches job specifications.

Install on a Solid, Level Mounting Pad

If conditions or local codes require the unit be attached to pad, tie
down bolts should be used and fastened through knockouts

provided in unit base pan. Refer to unit mounting pattern in Fig. 2
to determine base pan size and knockout hole location.
For hurricane tie downs, contact distributor for details and PE

Certification (Professional Engineer), if required.
On rooftop applications, mount on level platform or frame. Place

unit above a load--bearing wall and isolate unit and tubing set from
structure. Arrange supporting members to adequately support unit

and minimize transmission of vibration to building. Consult local
codes governing rooftop applications.
Roof mounted units exposed to winds above 5 mph may require

wind baffles. Consult the Service Manual -- Residential Split
System Air Conditioners and Heat Pumps for wind baffle

construction.
NOTE: Unit must be level to within ±2° (±3/8 in/ft,±9.5 mm/m)

per compressor manufacturer specifications.

Clearance Requirements

When installing, allow sufficient space for airflow clearance,

wiring, refrigerant piping, and service. Allow 24 in. (609.6 mm)
clearance to service end of unit and 48 in. (1219.2 mm) (above

unit. For proper airflow, a 6--in. (152.4 mm) clearance on 1 side of
unit and 12--in. (304.8 mm) on all remaining sides must be

maintained. Maintain a distance of 24 in. (609.6 mm) between

units or 18 in. (457.2 mm) if no overhang within 12 ft. (3.66 m).
Position so water, snow, or ice from roof or eaves cannot fall

directly on unit.
NOTE: 18” (457.2 mm) clearance option described above is
approved for outdoor units with wire grille coil guard only.
Units with louver panels require 24” (609.6 mm) between units.
On rooftop applications, locate unit at least 6 in. above roof

surface.

3/8---in. (9.53 mm) Dia.

Tiedown Knockouts in

Basepan(2) Places

View From Top

UNIT BASE PAN

Dimension in. (mm)

TIEDOWN KNOCKOUT LOCATIONS in. (mm)

A

B

C

26 X 26

(660 X 660)

9–1/8 (231.8)

4–7/16 (112.7)

21–1/4 (539.8)

31–1/2 X 31–1/2

(800 X 800)

9–1/8 (231.8)

6–9/16 (166.7) 24–11/16 (627.1)

35 X 35

(889 X 889)

9–1/8 (231.8)

6–9/16 (166.7)

28–7/16 (722.3)

A05177

Fig. 2 -- Tiedown Knockout Locations

Operating Ambient

The minimum outdoor operating ambient

in cooling mode

without accessory is 55°F (12.78°C), and the maximum outdoor

operating ambient in cooling mode is 125°F (51.67°C). The

maximum outdoor operating ambient in heating mode is 66 °F
(18.89°C).

Check Defrost Thermostat

Check defrost thermostat to ensure it is properly located and
securely attached. There is a liquid header with a brass distributor

and feeder tube going into outdoor coil. At the end of the one of

the feeder tubes, there is a 3/8 in. O.D. stub tube approximately
2 in. (50.8 mm) long (see Fig. 3). The defrost thermostat should be

located on stub tube. Note that there is only one stub tube used
with liquid header, and on most units it is the bottom circuit.

FEEDER TUBE

DEFROST

THERMOSTAT

STUB TUBE

A97517

Fig. 3 -- Defrost Thermostat Location

Make Piping Connections

!

WARNING

PERSONAL INJURY AND ENVIRONMENTAL

HAZARD
Failure to follow this warning could result in personal injury

or death.
Relieve pressure and recover all refrigerant before system

repair or final unit disposal.
Use all service ports and open all flow--control devices,

including solenoid valves.

CAUTION

!

UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage

or improper operation.
If ANY refrigerant tubing is buried, provide a 6--in (152.4

mm). vertical rise at service valve. Refrigerant tubing lengths

up to 36--in (914.4 mm). may be buried without further special

consideration. Do not bury lines longer than 36 in (914.4 mm).

Outdoor units may be connected to indoor section using accessory
tubing package or field--supplied refrigerant grade tubing of correct

size and condition. For tubing requirements beyond 80 ft,
substantial capacity and performance losses can occur. Following

the recommendations in the Residential Piping and Long Line

Guideline will reduce these losses. Refer to Table 1 for accessory
requirements. Refer to Table 2 for field tubing diameters.
There are no buried--line applications greater than 36 in. (914.4
mm)
If refrigerant tubes or indoor coil are exposed to atmosphere, they
must be evacuated to 500 microns to eliminate contamination and

moisture in the system.