Final checks, Care and maintenance – FloAire 25HBC User Manual

Page 9

Advertising
background image

9

FINAL CHECKS

IMPORTANT: Before leaving job, be sure to do the following:

1. Ensure that all wiring is routed away from tubing and sheet

metal edges to prevent rub--through or wire pinching.

2. Ensure that all wiring and tubing is secure in unit before

adding panels and covers. Securely fasten all panels and

covers.

3. Tighten service valve stem caps to 1/12--turn past finger

tight.

4. Leave Owner’s Manual with owner. Explain system opera-

tion and periodic maintenance requirements outlined in

manual.

5. Fill out Dealer Installation Checklist and place in customer

file.

CARE AND MAINTENANCE

For continuing high performance and to minimize possible
equipment failure, periodic maintenance must be performed on this

equipment.
Frequency of maintenance may vary depending upon geographic

areas, such as coastal applications. See Users Manual for

information.

25H

B

B

/25H

B

C

Advertising
This manual is related to the following products: