III.
Semi-Permanent Installation
Ground Sleeve:
1. Place the ground sleeve into the footing and fully support it in a plumbed
position (figure 8).
2. Pour concrete into the footing and reinforce with six 3/4” x 48” long rebar
(consult local building code. Rebar not included, to be provided by
installer) evenly space around the spot for the lower foul pole.
3. Slope the top of the footing for drainage if desired. Wait for concrete to
fully cure (approx. 48 hours) before proceeding to attach the top foul pole
section.
4. Now proceed to the next section.
FIGURE: 8
Advertising
See also other documents in the category Jaypro Sports Sports and recreation:
- GNJA1 Installation (7 pages)
- BLPS-84 (5 pages)
- BBLD-5000 (18 pages)
- BLFS-101 (5 pages)
- BSP-30 (5 pages)
- BSP-40 (5 pages)
- BSP-40-66 (9 pages)
- BSP-30-6 (9 pages)
- BSP-33-2 (10 pages)
- BSP-44-22 (10 pages)
- BBTF-55 (8 pages)
- PROTF-55 (7 pages)
- BBTFSM-55 (10 pages)
- BBC-SPDKT (13 pages)
- BBC-700M (24 pages)
- BBC-WLKT (10 pages)
- BBC-SPRTKT (8 pages)
- CVS-10 (2 pages)
- BGLC-7500RD (24 pages)
- BBLS-12 (14 pages)
- BBGS-18RB (15 pages)
- BBFP-20 (5 pages)
- FS-101 (4 pages)
- FS-77 (4 pages)
- PS-84 (5 pages)
- BLFSW (5 pages)
- BLFS-88 (5 pages)
- PSTS-77 (5 pages)
- LC-1 (3 pages)
- LC-6 (16 pages)
- PBEL54 (31 pages)
- MBBP-6 (2 pages)
- GBDD-AHA (9 pages)
- GAK-5 (4 pages)
- GBA-542 (10 pages)
- TSP-200 (15 pages)
- TSP-44 (15 pages)
- 996 (4 pages)
- 656 (4 pages)
- PBB-200 (13 pages)
- PBEL-SCB (6 pages)
- Stationary Backstops (16 pages)
- WM-48 (5 pages)
- WMSS (13 pages)