2 rs-485 controller network, Proximity elevator control panel – Keri Systems LC-508 Proximity Elevator Control User Manual

Page 11

Advertising
background image

Proximity Elevator Control Panel

2305 Bering Drive

01941-001 Rev. B

San Jose, CA 95131 USA
(800) 260-5265 (408) 435-8400 FAX (408) 577-1792
Web: www.kerisys.com E-mail: [email protected]

Page 11 of 22

LC-502P/LC-508P

Quick S

tart Guide

Figure 6: Floor Control Relay Connection

5.2.2

RS-485 Controller Network

All of the controllers in the elevator network communicate through an RS-485 serial
communication network. Per the RS-485 industry specification, this network must be daisy-
chained, with a total network cable length of no more than 16,000 feet. Make the RS-485 network
connections per the information in Table 3 and Figure 7 on page 12.

NOTE: Connect shield ground at the master controller ONLY. The LC-500P controller
automatically connects earth ground to the shield at one point on the network. This single
connection minimizes the effects of ground loops that can affect controller performance.

Table 3: RS-485 Controller Network

TB-1 Pin

Description

1

Tx/Rx Negative

2

Tx/Rx Positive

3

Network Cable Shield Ground

Advertising
This manual is related to the following products: