Switch differential, Switch delay, Heavy load sequence 2nd group – LAARS M4-Ext - Installation Manual User Manual

Page 17: Condensing boiler type, Condensing and non-condensing boiler number

Advertising
background image

Installation Manual

17

SWiTCH diFFERENTiAL

Adjustable from 5Fº / 3Cº to 20Fº / 11Cº

Default: 5Fº / 3Cº

Button: MENU/<System Startup>/..../Switch Setpoint/Switch Diff

• The Switch Differential controls the group switching. It allows the Target Temperature to

drop a specified number of degrees below the Switch Set Point before changing the lead

group over.

• The Switch Differential should be set to a high setting to reduce the switching frequency

between the Condensing and Non-Condensing Boiler Groups, particularly if no Switch

Delay was set. See next setting.

--- SWITCH DIFF ---

5

o

F

[ ]

BACK ▲ ▼ SAVE

SWiTCH dELAY

Adjustable from 0.0 to 12.0 Hours

Default: 0.5 hours

Button: MENU/<System Startup>/..../Switch Setpoint/Switch Diff/Switch Delay

• The Switch Delay is an additional layer of assurance used to reduce the intermittent change

of the lead group.

• To switch the lead group when the temperature is dropping, the Target Temperature must

drop below the Switch Set Point less the Switch Differential and remain below the Switch

Set Point for the complete Switch Delay period before the switching of the lead group could

take effect. That is, if the Switch Set Point was set to 135ºF, and the Switch Differential

was set to 5Fº, then the Target Temperature must drop below 130ºF for the complete Switch

Delay for the lead group to change from condensing to non-condensing.

• To switch the lead group when the Target Temperature is rising, the Target Temperature must

rise above the Switch Set Point for the complete Switch Delay before the switching of the

lead group could take effect.

• Note that if the Switch Delay was set to 0.0 hours, the M4-CNC will utilize it built-in

delays. These delays vary between 3 to 15 minutes based on the Boiler Types used.

--- SWITCH DELAY ---

0.5

Hour

[ ]

BACK ▲ ▼ SAVE

HEAvY LOAd SEqUENCE 2Nd gROUP

Yes, No

Default: Yes

Button: MENU/<System Startup>/..../Switch Delay/Heavy Load Seq#2 Group

• This option makes the second group of boilers act as a backup in heavy load conditions.

Thus, allowing them to start after all lead group boilers have run at their maximum capacity.

• If the system was designed to operate both groups of boilers in heavy load conditions, then

select Yes.

• Selecting No will only allow the lead group to operate. The secondary group will remain off

even if the system cannot reach the desired set point.

HEAVY LOAD

-SEQUENCE #2 GROUP-

No

Yes

BACK ▲ ▼ SAVE

CONdENSiNg BOiLER TYPE

Modulating, Staging

Default: Modulating

Button: MENU/<System Startup>/..../Heavy Load Seq#2 Group/Condensing Boiler Type

• Select the appropriate boiler type from the list. Each of the types will be followed by a

related additional configuration settings to adjust.

CONDENSING

---- BOILER TYPE ----

Modulating

Staging

BACK ▲ ▼ SAVE

CONdENSiNg ANd NON-CONdENSiNg BOiLER NUMBER

Adjustable from 1 to 15

Default: 1

Button: MENU/<System Startup>/..../Condensing Boiler Type/ Condensing Boiler Number

• Select the number of condensing boilers. These boilers will occupy the first letters of the

wiring stages on the M4-CNC starting with Stage-A.

Then, select the number of non-condensing boilers later in the Startup menu. See "Startup

Menu Sequence" on page 15.

CONDENSING

-- BOILER NUMBER --

2

[ ]

BACK ▲ ▼ SAVE

LAARS Modulating Controls M4 & M4-EXT

HT# 059104-00 B

Advertising
This manual is related to the following products: