LAARS Mighty Max HH (Sizes 320M - 1000M) - Installation, Operation and Maintenance Instructions User Manual

Page 2

Advertising
background image

Page 2

LAARS HEATING SYSTEMS

TABLE OF CONTENTS

SECTION 1.
General Information

1A.

Introduction .................................................... 3

1B.

Warranty ........................................................ 3

1C.

Technical Assistance ..................................... 3

SECTION 2.
Installation Instructions

2A.

General Information ....................................... 4

2B.

Boiler Placement ........................................... 4

2C.

Installation of Outdoor Boilers ........................ 4

2D.

Freeze Protection .......................................... 4

2E.

Installation of Indoor Boilers ........................... 5

2E-1.

Combustion Air Supply and Ventilation .......... 5

2E-2.

Removal of Existing Boiler ............................. 5

2F.

Gas Supply and Piping .................................. 6

2G.

Water System Requirements ......................... 8

2G-1.

Flow Requirements ........................................ 8

2G-2.

Variable Water Flow Systems ........................ 8

2G-3.

System Pressure Requirements .................... 9

2G-4.

Hot/Chilled Water Systems ............................ 9

2G-5.

Combined Space Heating/Potable
Water Heating Systems ................................. 9

2H.

Piping of System to Boiler .............................. 9

2I.

Filling the System ........................................ 10

2J.

Venting and Combustion Air Information ..... 10

2K.

Top-to-Rear Vent Collar Conversion ............ 12

2L.

Venting ........................................................ 13

2L-1.

Vertical Venting - Category I ........................ 13

2L-2.

Vertical Venting - Non Category I ................. 13

2L-3.

Vertical Venting - Non Category 1 ................ 13

2L-4.

Side Wall Vent Terminal .............................. 14

2M.

Air for Combustion and Ventilation ............... 14

2M-1.

Air From Room ............................................ 15

2M-2.

Ducted Combustion Air ................................ 15

2M-3.

Conversion for Ducted
Combustion Air ............................................ 15

2M-4.

Combustion Air Piping ................................. 16

2N.

Electrical Wiring ........................................... 16

SECTION 3.
Operating Instructions

3A.

Start Up Requirements ................................ 16

3B.

Hi-Limit checkout ......................................... 18

3C.

Venturi and Gas Pressure
Regulator System ........................................ 18

3C-1.

Overall Operation ......................................... 18

3C-2.

Venturi Adjustment ...................................... 18

3D.

To Start Up System ..................................... 19

3D-1.

Setting Temperature Controls ...................... 20

3E.

To Shut Down System ................................. 20

3F.

Venturi Combustion Flow System ................ 20

3F-1.

Pressure Measurement Ports ...................... 20

3F-2.

Venturi Adjustment ...................................... 20

3F-3.

Venturi Setup Procedure .............................. 22

SECTION 4.
Maintenance

4A.

General Instructions ..................................... 22

4B.

Heat Exchanger ........................................... 22

4B-1.

Inspection of the Heat Exchanger ................ 23

4B-1a. External heat Exchanger Inspection ............ 23
4B-1b. Internal Heat Exchanger Inspection ............. 23
4B-2.

Cleaning the Heat Exchanger ...................... 23

4B-2a. Cleaning the Heat Exchanger - External ...... 23
4B-2b. Cleaning the Heat Exchanger - Internal ....... 23
4C.

Gas and Electric Controls ............................ 23

4D.

Filter ............................................................ 24

4D-1.

Filter Function .............................................. 24

4D-2.

Filter Service ................................................ 24

SECTION 5.
Troubleshooting

5A.

Sequence of Operation ................................ 24

5B.

Venturi and Gas Pressure
Regulator System ........................................ 26

5B-1.

Field Checkout ............................................. 26

5C.

Electrical Components ................................. 26

5C-1.

General Troubleshooting ............................. 26

5C-2.

Electrical Troubleshooting ........................... 26

SECTION 6.
Parts List for Mighty Max HH Boiler

6A.

General Information ..................................... 27

Advertising