LAARS Mighty Max HH (Sizes 320M - 1000M) - Installation, Operation and Maintenance Instructions User Manual

Page 7

Advertising
background image

Mighty Max Hydronic Boiler

Page 7

Figure 4. T-Fitting Sediment Trap Installation.

Gas Supply
Inlet

Tee
Fitting

3 In.
(76mm) Min.

Cap

Nipple

To Equipment
Inlet

SIZES:

320M, 400M

SIZES:

520M, 625M

SIZES:

775M, 1000M

Figure 3. Boiler Gas Valve Arrangement.

Note: The above diagram is a representation. Actual venturi assembly may vary depending on boiler size.

Venturi

Air Shutter
Enclosure

Automatic,
Regulator
and
Redundant
Gas Valve

Mixture
Plenum

Mixture
Plenum

Filter
Housing

Blower
Motor

Air Shutter
Enclosure

Filter
Housing

Venturi

Automatic
and
Redundant
Gas Valve

Mixture
Plenum

Blower
Motor

Regulator

Manual Gas
Valves When
Used On
Canadian Unit
or U.S.Unit
Requiring
CSD-1 Code

Air Shutter
Enclosure

Filter
Housing

Blower
Motor

Regulator

Venturi

Manual Gas
Valves When
Used On
Canadian Unit
or U.S.Unit
Requiring
CSD-1 Code

Automatic
Main
Gas Valves

NOTE: The boiler and all other gas appliances

sharing the boiler gas supply line must be firing at
maximum capacity to properly measure the inlet
supply pressure. Low gas pressure could be an
indication of an undersize gas meter and/or obstructed
gas supply line.

8.

Do not exceed the maximum inlet gas pressures
specified. Excessive pressure will result in
damage to the heater's gas controls. The
minimum pressures specified are for gas input
adjustment.

9.

The correct differential gas pressure is stamped
on the rating plate. The regulator is preset at the
factory, but may need adjustment for altitude per
Section 3.

10.

Before operating the heater, test the complete
gas supply system and all connections for leaks
using a soap solution.

Caution

Since some leak test solutions (including soap
and water) may cause corrosion or stress
cracking, rinse the piping with water after
testing.

Advertising