Appendix, Converting model eedu duct furnace for lower, Temperature rise and higher cfm application – Reznor EEDU Unit Installation Manual User Manual

Page 30

Advertising
background image

Form I-EEDU, Page 30

APPENDIX

Converting Model EEDU Duct Furnace for Lower

Temperature Rise and Higher CFM Application

NOTE: If airflow is being

reversed or other field-

installed options apply, refer

to the other information

in Paragraph 3.2 before

performing this conversion.

FIGURE 28 - Fill in the

information on the

Conversion Label

Description/Application

2. Remove the Heat Exchanger Baffles - Refer to FIGURE 29 and identify the air

baffles to be removed. Remove the screws from the support brackets and slide the

entire baffle assembly out of the heat exchanger. Reinstall the screws to plug the

holes.

This Reznor duct furnace was factory assembled with the air throughput range listed

on the rating plate. The conversion in these instructions will change the air throughput

range as specified in the table below.

Model and

Size

High Air Throughput (CFM)

MAXIMUM

MINIMUM

EEDU 75-6

2778

855

EEDU 100-6

3704

1140

EEDU 125-6

4630

1425

EEDU 140-6

5185

1595

EEDU 170-6

6296

1937

EEDU 200-6

7407

2279

EEDU 225-6

8333

2564

EEDU 250-6

9259

2849

EEDU 300-6

11111

3175

EEDU 350-6

12963

3704

EEDU 400-6

14815

4233

Verify the size on the heater rating plate. After confirming that this conversion is correct

for the unit, follow the instructions below.
1. Fill in the Field Conversion Label - Remove the conversion label, P/N 263310,

from the literature bag. Complete the information.

(date)

(name & address of company making this conversion)

263308

WARNING

This conversion shall be done by a qualified service agency in accordance with the manufacturer’s

instructions and all applicable codes and requirements of the authority having jurisdiction. If the

information in these instructions is not followed exactly, a fire, explosion or production of carbon

monoxide may result causing property damage, personal injury or loss of life. The qualified service

agency performing this work assumes responsibility for the conversion of this appliance to provide

for higher CFM.

WARNING

The instructions in this sheet are designed to prepare a Reznor duct furnace for increased air

throughput conversion prior to installation. If your duct furnace is installed, for your safety, turn off

the gas and the electric before servicing.

Advertising