Installation instructions (cont'd), Form i-xe/crgb/rpb, page 40 – Reznor XE Unit Installation Manual User Manual

Page 41

Advertising
background image

Form I-XE/CRGB/RPB, Page 40

7

8

9

10

12

13

14

15

16

17

18

19

20

21

L1

L2

8

BL

BK

W

7

BR

L1

L2

62

63

63

62

BL

BR

BR

4

5

RELAY CONTACTS

DISCHARGE DAMPER

2

DISCHARGE DAMPER MOTOR

WITH AUXILIARY SWITCH

L1

L1

L2

L2

BL

R

O

BR

CW

COM

CCW

FUSE

8.0 AMP

BK

BK

BK

W

W

11

R

6

40 VA. DISCHARGE DAMPER MOTOR

TRANSFORMER

26

25

24

22

23

27

BL

T3

L3

208/3/60

GRD

L1

G

BK

CONTACTS

BLOWER RELAY

BK

1

3

S

BK

BK

L2

T2

CONTACTS

BLOWER MOTOR

CONTACTOR

L1

OVERLOAD

RELAY

T1

96

O.L.

95

W

CR

12

A2

A1

W

BLOWER MOTOR

CONTACTOR COIL & O.L.

7 - 8 - 9

L2

MOTOR

BLOWER

24V

BR

208V

R

Y

BL

BK

*

*

*

*

WIRES SHIPPED IN DOWNTURN

PLENUM FOR FIELD WIRING

BK

CONTACTS

FAN CONTROL

8

BL

8

BL

8

8

BL

BL

BL

8

1

28

SWITCH

CONTROL

ON-OFF

DP-ST

8

Y

DISCHARGE DAMPER

AUXILIARY SWITCH

SET TO CLOSE WHEN

DAMPER IS A 20% OPEN

CONTACTS

FAN CONTROL

BL

1

R

Y

52

3

Y

52

3

R

Y

52

COM

NO

Y

NC

10

R

10

10

10

R

R

R

10

R

10

10

R

R

HEAT PERMISSIVE

RELAY CONTACTS

BK

35

2

4

BK 34

BR

22

Y

POST PURGE

RELAY CONTACTS

BL

R

2

5

53

4

PR

Y

R

R

R

3

CR

27

BR

1

7

3

25
CR

3

3

CR

CR

24

23

CR

1

1

1

7

BK

3

21

CR

1

BR

BR

EXHAUST

15 - 16

RELAY COIL

12

RELAY COIL

BLOWER

27 - 28

RELAY COIL

21

HEAT PERMISSIVE

RELAY COIL

BR

BR

BR

7

7

7

7

7

HEATER

RELAY COIL

39
POST PURGE

BR

7

H1

24V

208V

X1

H2

X2

H3

200 VA CONTROL

TRANSFORMER

BR

BK

W

*

*

(SEE NOTES)

DISCONNECT SWITCH

OPTIONAL FIELD WIRING

OPTIONAL FACTORY WIRING

FACTORY WIRING

FIELD WIRING

REMOTE CONSOLE

BLOWER COMPARTMENT

UNIT #2

UNIT #1

WHITE - W

PURPLE - PR

BLUE - BL

GREEN - G

YELLOW - Y

ORANGE - O

RED - R

BROWN - BR

BLACK - BK

WIRING CODE

FIGURE 46G - Sample of a Partial Wiring Diagram showing Typical Field-wiring Connections for Optional Discharge Damper

36. Optional Cooling Coil Cabinet, Option AU (Outdoor Models) (cont'd)

Installation Instructions (cont'd)

FIGURE
46F

On the
furnace
section,
remove
the center
hole plug

FIGURE 46H - To install side and top filler panels, remove
screws from top corners of both cabinets and the entire row
across the cooling coil cabinet.

Remove row of screws.

Remove
corner
screws.

Remove
corner
screws.

6. Prepare Cabinets to Install Filler Panels (See FIGURE 46H)

a) At the side corners of both the cooling coil cabinet and the

furnace, remove the factory-installed screws that attach the
cabinet tops.

b) Across the edge of the cooling coil cabinet, remove the row of

screws that attach the top.

the blockoff plate and drill a 7/8" hole. The hole should be
approximately even with the hole drilled in the downturn
plenum leg.

Third Hole:

On the cabinet leg on the entering air side of the cooling coil cabi-
net, measure up 10" (254mm) from the bottom pan. At that height,
measure in 4" (102mm) from the edge and drill a 7/8" hole.

b) On the outside of the furnace section

(where the flanges were joined in Step 4),
locate the three hole plugs. Remove the
center plug exposing a 7/8" hole in the
cabinet leg. See FIGURE 46F.

c) Run the wires attached to the damper mo-

tor 1) out through the hole in the dis-
charge plenum leg into the cooling coil
cabinet, 2) through the blockoff plate,
across the coil cabinet, 3) out through the
hole in the cooling coil cabinet leg, and 4)
into the furnace section.

d) On the bottom of the electrical box in the furnace section, remove the

hole plug that is below the terminal blocks. Route the damper motor
wires up through the hole and into the electrical box. Attach accord-
ing to the connections on the wiring diagram. Refer to sample in
FIGURE 46G.

7. Install the Cabinet Side Filler Panels (See FIGURE 46J)

Place a piece of the supplied insulation against the inner panel of the
cooling coil cabinet. Slide the filler panel into place and attach with
1/2" sheetmetal screws. Repeat on the other side. NOTE: It may be
easier to slide the filler panels in place with the door panels re-
moved.

Advertising