Venting and combustion air (cont'd), Installation requirements for option cc2, Installation instructions for option cc2 – Reznor SFT Unit Installation Manual User Manual

Page 11

Advertising
background image

Form RZ -NA-I-SFT, Page 10

9. Venting and Combustion Air (cont'd)

Installation Requirements for Option CC2

Collar for

combustion

air pipe.

Vent Pipe - when a taper-type

reducer is required in the

vent pipe; it must be no more

than 6”(152mm) from the box.

Seal the seam in

the vent pipe.

Concentric

Adapter Box

Combustion

air pipe

Field-supplied

mounting brackets

Install seal

in vent pipe

opening

Vent Flow

Combustion Air

Flow

Install the vent pipe

by inserting it into

the terminal side of

the box and pushing

it out through the

seal on the heater side

NOTE: Be sure

vent flow direction

is correct.

Field-supplied installation requirements:

Thimble (a thimble is not required if roof is of non-combus-
tible construction)

Flashing

Vent pipes (see requirements on pages 6-7)

Combustion air pipes (see requirements on page 7)

Mounting brackets for concentric adapter box (or box may be
mounted flush, depending on construction)

Joint connection reducers and/or enlargers (see requirements
on page 7)

Installation Instructions for Option CC2

1. Determine the location for the vent terminal on the roof,
allowing room for the concentric adapter box inside. A thimble
may or may not be required depending on building construction
and/or local codes. Prepare a hole through the roof for the com-
bustion air pipe. The air inlet pipe must be flashed or sealed to
the roof. Flashing is to be supplied by the installer as required by
roof construction and/or codes.

WARNING: All vent terminals must be positioned
or located away from fresh air intakes, doors and
windows to preclude combustion products from
entering occupied space. See Hazard Levels, page
2.

2. Prepare the concentric adapter box.
2a) Determine whether field-supplied brackets are required.

If used, attach brackets securely; do not leave any unsealed
holes in the adapter box. If brackets are not used, when in-
stalled the box should be against the roof.

2b) Install the rubber seal and the vent pipe. Locate the vent

pipe opening and place the rubber seal around and over the
edge of the metal.

Determine the length of
the section of vent pipe
by adding the require-
ments. The vent pipe
must extend a maximum
of 6" (152mm) on the
heater side (if a reducer
is required); plus 6"
(152mm) through the
box; plus bracket length;
plus the width of the roof;
plus the length of the
outer inlet air pipe; plus
a minimum of 22"
(559mm).

Lubricate the seal and pipe with liquid soap or a rubber lubri-
cant. (Installation Tip: Spray cooking oil works well as a lu-

7A

"X" is the length of combustion
air pipe required through and
above
the roof
"X" must equal roof thickness
plus
clearance required for
anticipated snow plus ridge and/or
parapet
"X" must not
exceed 60"
(1524mm)

bricant for this task.) Being sure the pipe is in the proper flow direction,
slide the end through the box and push it out through the rubber seal.
Push evenly using caution not to displace the seal from its position on
the edge of the hole. If the rubber seal moves, slide the pipe back slightly,
re-position the seal, and slide the pipe through again. When the vent pipe
is in its final position, re-check the seal to be sure that it has not rolled in.
Adjust the pipe and seal until the seal is in the correct position on the
edge of the hole and tight to the entire circumference of the pipe.
Position the vent pipe so that it will protrude a minimum of 22" (559mm)
past the end of the combustion air pipe. See Figure 7A.
If a taper type connection is required in the vent run, no more than 6"
(152mm) of vent pipe should extend out the heater side of the adapter
box.

2c) Attach the outside portion of the combustion air pipe to the box.

Determine the length of the combustion air pipe so that dimension "X"
(Figure 7A) is equal to the roof thickness, plus snow depth and ridge or
parapet clearance, but does not exceed 60" (1524 mm). Attach the com-
bustion air pipe to the collar with sheetmetal screws being careful not to
penetrate the vent pipe.

Worksheet - Determine Length of
Vent Pipe through the Box

inches mm

Heater Side (max if +

6

152

different diameters)
Width of Box

+

6

152

Bracket Length

+

__

___

Width of Roof

+

__

___

Inlet Pipe Height

+

__

___

Terminal Side (min) +

22

559

Length of Pipe

=

Instructions and Requirements for Installing a Vertical Vent Terminal/Combustion Air Inlet
(Requires Concentric
Adapter Kit,
Option CC2)

Q ty

Siz e

P/N

De scripti on

1

45-125

157155

150-250 157156

300

54444

1

45-125

155118

150-250 155392

300

68404

1

45-250

155631 Exhaust

300

53326 T erminal

Complete Vert ical Vent Kit

(Same as Opt ion CC2)

Concent ric Adapter Box

Assembly (See Figure 3A)

Q ty

Siz e

P/N

De scripti on

1

45-250

155635

Combustion

300

53330

Air Inlet

1

45-250

164492 4" I.D. Rubber Seal

300

164493 5" I.D. Rubber Seal

1

45-300

53335

T ube of High T emperat ure

(450°F) Silicone Sealant

Advertising