Installation, 6 installation – SeaLand DTM01 Tank Monitor User Manual

Page 6

Advertising
background image

6

Installation

DTM01 Tank Monitor

6 Installation

1. Select panel location away from direct contact with water and oil.
2. Confirm clearance for wire connections behind wall, hull liner or

bulkhead.

3. Using indicator panel template (fig.

6

, p. 9), cut out panel access

hole and drill fastener holes.

4. With electrical power off, route 18-gauge stranded copper wire from

power source, through 0.5 amp fuse (not provided), to panel location.

Route 18-gauge stranded copper wire from holding tank probe

assembly to panel location. Make sure wires extend out through

access hole (fig.

3

2, p. 2).

5. Install mounting frame (fig.

3

1, p. 2) with four #6 fasteners (provided).

6. Make proper 12 or 24 V DC wiring connections to indicator panel.

Refer to wiring diagram (fig.

5

, below).

7. Push indicator panel onto mounting frame until it locks into place.

6.1

Indicator Panel

(fig.

3

, page 2)

Caution!
Do not install indicator panel in an atmosphere with potentially
flammable or explosive vapors.

5

Advertising