Slant/Fin EC-10 Assembly Instructions User Manual

Page 5

Advertising
background image

5

5

6

8575N021A

- Pass the strap

between the cast iron body and the base.

- Install the insulation around the body, folding the bottom on each side of the boiler inside the base.

1

2

8575N022

Installing the insulating material

3

2

1

Fix the insulation using the strap(s) and the attach-

ment strip

.

- Put the back insulation into place and fix it onto the pre-

viously installed insulation using the fasteners

.

notch in front

- 1 strap on the 3 and 4 section versions,
- 2 straps on the 5 and 6 section versions

Advertising