Pad mounting (sw470) – Chamberlain LIFTMASTER PROFESSIONAL SW470 User Manual

Page 10

Advertising
background image

10

c

8"

8"

6"

Operator

24"

22-1/2"

9-3/4"

Concrete pad 18"x34" min.

1/2" Redhead
(4 required.)

Fence

Hinge Pin

Parallel Mount

Centerline

Gate

8"16"1/2" Redhead
(4 required)

SW470
Perpendicular

Profile of
Operator

Concrete pad
18"x34" min.

18-3/4"

Perpendicular Mount

22-1/2"

10

PAD MOUNTING (SW470)

1. Layout the concrete pad (Figure 1).

IMPORTANT NOTE: The relative location of the operator to the
fence and the gate is critical. Be sure that the measurements for
operator mounting are taken from the centerline of the fence and
of the gate hinge.

2. Locate electrical conduit, as required, prior to pouring concrete.

3. Pour concrete pad.

4. Bolt the (2) pad mount brackets to the bottom of the operator

with the hardware provided.

5. Secure the operator to the concrete pad. It is very important

that the operator be level and square to the gate.

Figure 1

Figure 2

I N S T A L L A T I O N

Using suitable hardware secure
operator to L-bolts

Power and control wiring should be
run in separate conduit

Concrete Pad

Depth required by
local codes or below
frost line

2" to 4" above grade

1/2" red head bolts or
anchors (4 required)

Advertising
This manual is related to the following products: