M. final assembly of gate operator – Chamberlain SL 1000-XI User Manual

Page 20

Advertising
background image

Rev C

Doc

6001194

(01-20259)

17 of 36

M. FINAL ASSEMBLY OF GATE OPERATOR

Figure 17. Gate Operator Final Assembly

IMPORTANT SAFETY PROCEDURE

⇒ If switch S2 (Power Fail Open Direction switch) is set to OPEN the gate, cycle the gate to its

fully open position before performing step 1.

⇒ If switch S2 (Power Fail Open Direction switch) is set to CLOSE the gate, cycle the gate to its

fully closed position before performing step 1.

1. Turn off power to the gate operator at the circuit breaker and wait for one minute.
2. Install clear cover on gate operator control box.
3. Make sure that gate operator unit power switch is turned on.
4. Install gate operator cover and secure with four bolts.
5. Turn on power to the gate operator at the circuit breaker.
6. Cycle the gate to ensure it is operating properly.

Advertising