Switch installation, Preparing for installation, Warnings – Cisco 3750 User Manual

Page 19: Chapter 2, “switch installation, Incl

Advertising
background image

C H A P T E R

2-1

Catalyst 3750 Metro Switch Hardware Installation Guide

OL-9160-02

2

Switch Installation

This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that
ensures proper operation. It describes how to install the switch and make connections to the switch.
Read the topics and perform the procedures in this order:

Preparing for Installation, page 2-1

Verifying Switch Operation, page 2-5

Installing the Switch, page 2-7

Installing and Removing SFP Modules, page 2-14

Connecting to the 10/100 Ports, page 2-17

Connecting to an SFP Module, page 2-18

Where to Go Next, page 2-21

Preparing for Installation

This section covers these topics:

Warnings, page 2-1

Installation Guidelines, page 2-4

Verifying Package Contents, page 2-5

Verifying Switch Operation, page 2-5

Warnings

These warnings are translated into several languages in the Regulatory Compliance and Safety
Information Guide for the Catalyst 3750 Metro Switch
, which ships with the switch.

Warning

To prevent the switch from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of 113•F (45•C). To prevent airflow restriction, allow at least
3 inches (7.6 cm) of clearance around the ventilation openings.
Statement 17B

Advertising