Carrier 58DP User Manual

Installation, start-up and service instructions, 58dp,dr downflow gas-fired natural-draft furnaces

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

HEATING

A

COOLING

58DP,DR

Downflow Gas-Fired Natural-Draft Furnaces

Installation, Start-Up and Service

Instructions

NOTE:

Read the entire instructions before starting the

installation.

NOTE:

The Energy Guide tag can be removed from the fur­

nace when the installation is complete.

INTRODUCTION

Before installing the furnace, refer to “Procedures for

Natural-Draft Gas-Fired Furnaces” (packaged with the

equipment) for information concerning combustion, venting,

piping, and other standard installation practices. Further

reference is made to the current edition of the National Fuel

Gas Code NFPA No. 54, T1A-54-1984-1/ANSI Z223.1-1984,

Z223.1a-1987.

Each furnace is shipped from the factory completely assem­

bled with multispeed direct-drive blower and wired ready for

downflow indoor heating installation only. AU sizes feature

a printed-circuit board control center with easy-to-read, low-

voltage terminal strip to ensure proper connections.

A CAUTION

Do not install furnace in a damp, corrosive, or contami­

nated atmosphere. Make sure all combustion and circu­

lating air requirements listed in “Procedures for

Natural-Draft Gas-Fired Furnaces” are adhered to, in

addition to all local codes and ordinances.

Do not use this furnace during construction when adhe­

sives, sealers and/or new carpets are being installèd. If

the furnace is required during construction, use clean

outside air for combustion and ventilation. Compoxmds

of chlorine and fluorine when burned with combustion

air form acids which will cause corrosion of the heat

exchangers and metal vent system. Some of these com­

pounds are paneling and dry wall adhesives, paints,

thinners, masonry cleaning materials, and many other

solvents commonly used in the construction process.

The design of the downflow gas-flred furnace is A.G.A. cer­

tified for installation on noncombustible flooring. The fur­

nace may be installed on combustible flooring when

installed with the accessory floor base. This furnace is for

installation in alcoves, basements, closets, or utility rooms.

This furnace line is

not

A.G.A. design certified for installa­

tion in a mobile home, recreation vehicle, or outdoors.

Installation comprises the following:

*1. Inspection

*11. Location, Ventilation, and Air for Combustion

*III. Gas Piping

*IV. Venting

V. Supply-Air Plenum Installation

VI. Electrical

a

EFFICIENCY
RATING
CERTIFIED

ama

A78593

Fig. 1—Model 58DP

Table 1—Clearances (In Inches)

Sizes

050

075 thru 150

Sides—Single-Wall Vent

1

1

Type-BI Double-Wall Vent

0

1

Back

0

0

Top of Plenum

1

1

Vent Connector—Single-Wall

6

6

Type-B1 Double-Wall

1

1

Front-Combustion Air* *

6

6

Service

30

30

*The 6-inch front clearance is needed for combustion-air entry and

drafthood reiief.

VII. Sequence of Operation

VIII. Filter

IX. Startup and Adjustment

X. Care and Maintenance

*To perform these sections (or installation steps), refer to

the appropriate sections of “Procedures for Natural-Draft

Gas-Fired Furnaces” booklet packaged with this unit.

For accessory installation details, refer to the applicable

installation literature.

V. SUPPLY-AIR PLENUM INSTALLATION
A. Installation on a concrete slab

1. See Fig. 2 for dimensions and location of supply-air

opening in furnace bottom.

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

'' I

^

PC 101 Cataiog No. 535-871

Printed in U.S.A. Form 58DP,DR-2SI 11/87

Tab I6al8a

Pgl

Repiaces: 58DP,DR-1Si

Advertising