Carrier 58DRC User Manual

Installation, start-up and service instructions, 58drc counterflow gas-fired furnaces

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

HEATING & COOLING

58DRC

Counterflow Gas-Fired Furnaces

Installation, Start-Up and Service Instructions

for Sizes 045-095

NOTE. Energy Guide tag may be removed

from furnace when installation is complete.

G

efficiency

RATING

CGRTIFIED

ama

INTRODUCTION

Before installing the furnace, refer to Procedures for

Gas-Fired Furnaces (packaged with the equipment) for
information concerning combustion, venting, piping,

and

other

standard

installation

practices.

Further

reference is made to the current edition of the

National Fuel Gas Code, NFPA54-1984/ANSI Z223.1-

1984.

Each furnace is shipped from the factory completely

assembled with multispeed direct-drive blower and wired

ready for counterflow indoor heating installation only.
All sizes feature a printed-circuit board control center
with easy-to-read, low-voltage terminal strip to ensure

proper connections.

A

CAUTION

Do not install furnace in a corrosive or contami­

nated atmosphere. Make sure all combustion and

circulating air requirements listed in Procedures

for Gas-Fired Furnaces are adhered to, in addition

to all local codes and ordinances.

A

CAUTION

Do not block openings in front of furnace or on

furnace top along side vent pipe. These openings pro­
vide air for combustion and ventilation. Never store
anything on or in contact with furnace, such as:
aerosol cans, rags, brooms and mops, cleaning tools
and aids, powders, bleaches, waxes, plastic items,
gasoline, kerosene, lighter fluids, cleaning fluids,
thinners, painting compounds or paper products.

The design of the counterflow gas-fired furnace is

A.G.A certified for installation on combustible flooring

(with optional floor base), in alcoves, basements, closets

or utility rooms. This furnace line is not A.G.A. certified
for installation in a mobile home, recreation vehicle, or

outdoors

Installation Procedures:

Page

Inspection.......................................................................... *
Location, Ventilation and Air

for Combustion................................................................*

Gas Piping......................................................................... *

Venting..............................................................................*
Supply-Air Plenum Installation.........................................1

Electrical Connections.......................................................3

Sequence of Operation.......................................................4
Filter Arrangement............................................................ 5
Start-Up and Adjustment................................................... 6
Care and Maintenance....................................................... 6

*Refer to appropiiate sections in Pioceduies foi Gas-Fired Furnaces

packed with this furnace

For accessory installation details, refer to applicable

installation literature.

Fig. 1 — Model 58DRC

Table 1 — Clearances (in.)

SIZE 58DRC

ALL

Single-Wall Vent

1

Type-BI Double-Wall Vent

1

Back

0

Top of Plenum

1

Single-Wall

6

......... .. Type-B1 Double-Wall

1

„ Combustion Air

6

’ Service

30

NOTE. Some furnaces are shipped with paper across the
supply-air outlet. Remove the paper before installing

furnace.

INSTALLATION

Supply-Air Plenum Installation

INSTALLATION ON A CONCRETE SLAB

1 See Fig. 2 for dimensions and location of supply air

opening in furnace bottom

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obiigations.

Bookll 14

PC101

Catalog No 535-843

PrintedinUSA

Form58DRC-1SI

Pg 1

7-85

Replaces:New

For replacement items use Carrier Specified Parts

Tab |6al8a

Advertising