Step 3 — Field Fabricate Ductwork

— Secure all

ducts to building structure. Use flexible duct connectors

between unit and ducts as required. Insulate and weather­

proof all external ductwork, joints and roof openings

with flashing and mastic in accordance with applicable

codes.

Ducts passing through an unconditioned space must

be insulated and covered with a vapor barrier.

A minimum clearance is not required on 50DPE014

and 50DP016 units. The 50DP020 units with electric

heat require one-in. clearance the first 24 in. of ductwork.

Outlet grilles must not lie directly helow unit discharge.

Step 4 — Make Unit Duct Connections

— Unit

is shipped for through-the-bottom duct connections.

Ductwork openings are shown in Fig. 1 and 4. Duct

connections are shown in Fig. 5. Field-fabricated con­

centric ductwork may be connected as shown in Fig. 6 and

7. Attach all ductwork to roof curb and roof curb base-

pans. Refer to installation instructions shipped with

accessory roof curb.

t

NOTE: Do not drill in this area, damage to basepan may result
in water leak

Fig.

6

— Concentric Duct Air Distribution

50DR

DPE0I2,0I4

50DP0I6

INDOOR FAN MOTOR

NOTE Do not drill in this area, damage to basepan may result
in water leak.

Fig. 5 — Air Distribution — Through-the-Bottom

Step 5 — Trap Condensate Drain

— See Fig. 4

and 8 for drain location. Plug is provided in drain hole

and must he removed when unit is operating. One 3/4-in.

half coupling is provided inside unit evaporator section

for condensate drain connection. An 8-1/2in. x 3/4-in.

diameter and 2-in. x 3 / 4-in. diameter pipe nipple coupled

to standard 3/4-in. diameter elbows provide a straight

path down through holes in unit base rails (see Fig. 9).

A trap at least 4 in. deep must be used and must be pro­

tected against freeze-up.

Shaded area indicates block-off panels

NOTE. Dimension A, A1 and B, B1 are obtained from field-
supplied ceiling diffuser

Fig. 7 — Concentric Duct Details

i

f

FPT DRAIN

^ CONNECTION

11

drain

holes

Fig.

8

— Condensate Drain Details