Table 4 — Service Data

UNIT 50HQ.VQ

R-22 CHG (Ib-oz)*

Refrig Control

T

an

'

Motor Rpm

(3-speed)

HEAT EXCHANGER

WATER FLOW RATE

(Gpm)

014

f-F

018

1 022

...027 I

033

042

048 I

060

1-10

1 2-1

2-0 1

2-3

2-11

- i

Capillary Tube

Centrifugal — Direct Drive

Diameter (in. Nom)

10

10

10

10

10

11

10

Width (in. Nom)

7

7

7

7

7

7

8

Range Cfm

400-600

500-700

600-800

750-1000

950-1200

1040-1375

1400-1800

Motor Hp

1/8

1/8

1/6

1/6

1/4

1/3

1/2

2 5-5

•Factory refrigerant charge

1075 Nominal

--- " ~ -

_ — ----- - - - ‘ ■" - - - -

3-6

4-8

4 5-9

5-10

6-12

7-14

10
10

1750-2250

3/4

8 5-17

080

12

9

2300-3000

1

1000

11 5-23

COOLING CYCLE CHARGING CHART

METHOD

1. Operate unit a minimum of 10 minutes before

checking

charge,

and

after

each

charge

adjustment.

2. Measure suction pressure by attaching a gage to

unit suction service port (Schrader Fitting).

3. Measure discharge pressure by attaching a gage

to unit discharge service port (Schrader Fitting).

4. Using a sling psychrometer, measure wet-bulb

temperature of air entering unit.

5. Refer to correct Charging Chart. Locate on

curves where unit discharge pressure line and
indoor air wet-bulb temperature line intersect.

6. From intersect point, project horizontally left to

chart suction pressure line. Compare chart
suction pressure to unit suction pressure (step 2).

7. If unit suction pressure is lower than chart pres­

sure, add refrigerant to unit until chart pressure

is reached. If unit suction pressure is higher than
chart pressure, remove refrigerant until chart
pressure is reached.

150

200

250

300

COMPRESSOR DISCHARGE PRESSURE ® SERVICE PORT(PSIG)

Fig. 9 — Cooling Cycle Charging Chart

(R-22) — 50HQ,VQ014

COMPRESSOR DISCHARGE PRESSURE® SERVICE PORT (PSIG)

Fig. 10 — Heating Cycle Operation

Check Chart (R-22) — 50HQ,VQ014

COMPRESSOR DISCHARGE PRESSURE @ SERVICE PORT (PSIG)

Fig. 11 — Cooling Cycle Charging Chart

(R-22) - 50HQ.VQ018