A caution, A warning, Step 7 — make electrical connections — the – Carrier 580PB User Manual

Page 6: Step, Make electrical connections, 58ed,pb horizontal gas-fired furnaces

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

HEATING & COOLING

58ED,PB

Horizontal Gas-Fired Furnaces

Support all gas piping independent of the furnace. For

propane gas, a tank regulator is required to reduce supply
pressure to 12-13in.wg. For manifold pressure, see
Table 6.

Check all piping for leaks using soapy water and a

brush.

A CAUTION

Never use an open flame when testing for gas leaks!
Use a soap and water solution

A 1/8 in. NPT plugged tap accessible for test gage

connection must be installed immediately upstream of
the gas supply connection to the furnace if one is not
supplied on gas valve.

BURNER ORIFICES — The furnace is supplied with

standard orifices for the gas shown on the rating plate.
Table 6 shows combinations of heating values and
specific gravities for various fuels, from which proper
input may be obtained

Regardless of the type of gas used, when installation is

at an elevation of 2000 ft or more above sea level, orifices
may need to be changed, depending on local gas value.

For operation at elevations above 2000 ft, input ratings
should be reduced at the rates of 4% for each 1000 ft

above sea level. To change orifices, remove the burner

removal cover on the gas valve side of unit. Remove
manifold locking device and slide the manifold tray back
until each burner is clear of heat exchanger tube. See

Fig. 5 Pull the manifold tray forward until burners are

clear of furnace. Remove the locking device from each
burner and pull each burner back off the orifice.

A

CAUTION

Take care when removing the pilot burner not to

damage the pilot gas line.

After removing orifices, ensure the new orifiees are

seated properly and tightened. Replace burners correctly
and secure with the locking device before replacing and
securing the manifold assembly.

A

CAUTION

The manifold must be properly positioned in order
to engage the locking mechanism

Table 6 — Burner Orifices

TYPE OF GAS

(Heating Value — SP GR)

BTU PER CU FT

ORIFICE SIZE

(Drill No.)

NATURAL — MANIFOLD PRESS. 3.5 in. wg

800 — 0.6

43

900 — 0.6

44

1000 — 0.6

45

1100 — 0.6

46

PROPANE — MANIFOLD PRESS. 10 in. wg

2500 — 1.53

54

Fig. 5 — Burners Removed From Furnace

After securing the manifold assembly, replace all other

components and/or wiring, being sure that all connec­
tions and screws are tightened.

A

WARNING

If it is necessary to adjust the manifold pressure
more than 0.3 in. wg, the orifices must be changed

A

WARNING

Never set the furnace input rate above that shown
on rating plate.

Use the following formula to determine the furnace

input rate:

Input (Btuh) = Heating Value of Gas (Btu/cu ft)

______X 7200 sec/2 hr_______

Time in sec for 2 cu ft of gas

Example. If the heating value of natural gas is 1015

Btu/cu ft and it takes 75 seconds to burn 2cuft of gas,

then:

Input (Btuh) = 1015 Btu/cu ft X 7200 sec/2 hr

75 sec/2 cu ft

Input = 97,440 Btuh

When checking rate, make sure all other gas appliances

are shut off except for pilot burners.

Step 7 — Make Electrical Connections

— The

control system depends on the correct polarity of the
power supply. Connect field power wiring and field
ground wire as shown in Fig. 6 and 7.

A

WARNING

The unit cabinet must have a separate uninterrupted
or unbroken electrical ground to minimize personal

injury if an electrical fault should occur.

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book|1 |4

PC101

Catalog No 535-834

Printed in U S A

Form 58ED.PB-1 SI

Pg6

6-85

Replaces: 58PB-1SI

For replacement items use Carrier Specified Parts

Tab l6al8a

Advertising
This manual is related to the following products: