3 powering up the system, Powering up the system – ADLINK cPCIS-2500 Series User Manual

Page 15

Advertising
background image

Getting Started

9

2.3

Powering Up the System

Set the main power switch in the lower right corner of the rear panel to the off
position ( O ). Set the secondary power switch in the lower right corner of the
front panel to the off position ( I ). Connect the supplied power cord to the
socket on the back of the chassis. The supplied PSU is full range 90-240VAC
and does not require input voltage setting. Insert a system module and any
desired peripheral cards into the appropriate card slots.
To power up the system, set the secondary power switch on the front panel
to the on position ( II ).

Advertising