Fan operation, Controls, Customer hand over – Bonaire Series C - Commercial / Industrial User Manual
Page 14: Commissioning
I
NSTALLATION
,
O
PERATION
&
M
AINTENANCE
Commissioning
F
AN
O
PERATION
• Check that pulleys are correctly
aligned.
• Check the belt tension is correct.
Nominally 15 – 20mm
depression.
• Check bearings are tight on shaft
• Check bearings are packed with
grease.
• Set the fan running and check.
• Check that the air is being evenly
distributed through the ductwork.
• Make adjustments, as required, to any manual
air dampers that may be fitted.
• Fan Motor Current. Check the motor
operating current is not greater the rating plate
value.
o
For systems with high statics and
non standard drive check motor
current. Where required, review
pulley requirements relative to the
system static. Where variable pitch
pulleys are fitted adjust accordingly.
o
For systems with minimal static e.g.
straight dropper and plenums,
check motor current. A smaller
motor pulley to standard may be
required.
C
ONTROLS
Check all control functions are working
C
USTOMER HAND
O
VER
Instruct the customer in the use of the product.
• Controls
• Bleed
off
• Venting the air via the side of the premises the wind is not blowing from.
• Maintenance
Requirements
Hand over of the customer’s operational manual.
Page 14
Bonaire Commercial / Industrial EAC