Water installation, Connecting the water supply, Water connections – Bonaire Series C - Commercial / Industrial User Manual
Page 9
I
NSTALLATION
,
O
PERATION
&
M
AINTENANCE
Water Connections
Bonaire Commercial / Industrial EAC
W
ATER
I
NSTALLATION
A permanent water supply is required to be connected to the float valve, for float valve
installation. Units have been type test certified to MP52, Spec101. Certificate No.8663.
700C – 1500C
Connecting the Water Supply
• The water supply pipe work and connection
to the air conditioner must be installed by a
licensed plumber and conform to all local
regulations. The ball valve connection is
inside the unit.
• Ensure copper inlet pipe is secured to
prevent movement of the float valve.
• The supply pipe should be copper pipe or
similar approved. A manual water-isolating
tap must be installed on the supply pipe near
the unit for ease of maintenance. Do not use
duo or non-return valves of any kind.
NOTE: Non return type valves can have
and effect on the operation of the
water solenoid valves. Lock up
and damage can be caused.
• Fit water supply tap close to the unit to assist in routine servicing.
• Before connecting the supply pipe flush it of any swarf or debris that may cause the
float valve to leak.
NOTE: In areas where water pipes freeze, provisions will be needed to drain
the water piping to prevent damage to the air conditioner.
Page 9