When lifting the units with a crane, fit the
lifting tabs supplied to the 4 corner posts
of the unit in the holes provided. Ensure
a spreader bar is used to lift vertically
from each lifting lug.

Where lifting with a forklift, ensure the
lifting tines are long enough to reach right
through the bottom of the unit pallet.
Extension fork tines may be required.
Should you fail to do so, the water
reservoir may get damaged.

M

OUNTING THE

A

IR

C

ONDITIONER

1. A mounting stand must be provided with each

unit installed.

2. The stand must be designed to carry the

operating weight of the product. Where the units
are fitted on a roof, ensure the stand is installed
on a structurally sound section.

All installations must comply with the
relevant building codes, regulations and
engineering specifications for the building.

3. An insulator should be installed between the unit

base and stand to eliminate any possible
reaction between the metal stand and the
aluminium chassis.

4. Always ensure the unit is level.

5. Allow adequate access around the unit for

maintenance. Provision must be made for
access to electricity, water supply and drains.
High roofs need to be provided with permanent
access to carry out maintenance or warranty
work. It is the owner’s responsibility to provide
safe access to the unit. Climate Technologies
may refuse to do maintenance or warranty work
if access is unsafe. If any additional equipment
is needed to provide access to the unit, this must
be provided (and paid for) by the owner.