Chicago Gaming Vacation Pinball User Manual

Page 17

Advertising
background image

17

adjusting leaf switches. Note: to gain access to the slingshot switches you will need to
remove the plastic artwork covering this assembly.

.


9) FUSES:

The main A/C fuse is located on the top of the metal plate that the on/off switch is mounted to
(Inside the Cabinet). Be sure to replace it only with 3AG Slo Blo 3 Amp fuse.

There are four unregulated DC fuses located on the green PCB on the power supply chassis:

o 8 amp, 3AG fuse – On 45VDC
o 5 amp, 3AG fuse – On 24VDC
o 5 amp, 3AG fuse – ON 35VDC
o 3 amp, 3AG fuse – ON 12VDC (lights)


ONLY REPLACE FUSES WITH THE PROPERLY RATED FUSE.

The power supply chassis supplies seven different voltage sources to the game electronics. A
green LED indicates the presence of each separate voltage.









Advertising