SE Series Sound Enclosures

Thanks for purchasing a Display Devices product. We’re sure your customer will use this product for

years to come. Our products are designed to be maintenance-free saving you future service time. If you

experience any difficulties, please contact us at 303-412-0399. Thank you for your support.

The Sound Enclosure is designed to relocate projector noise to above a false ceiling. Sound Enclosures

work best when installed as part of a complete sound isolation system. For optimum sound isolation, we

recommend the following:

Add intake and exhaust ducts to the enclosures’ fire dampers – six feet or longer – this disperses

the sound away from the area it originates.

Insulate around the upper cavity on top of the ceiling tiles/media. Insulating this area increases
the barrier you create between the viewer and the noise source.

Plumb the unit to an external fresh air source, plumb the exhaust to another area away from the

viewing room.

Air intake is located on the projection port side.

Tools required

: Material Lift

Phillips head screwdriver

Powered screwdriver with Phillips bit

¾”, 9/16” and 7/16” socket and open end wrenches

5” socket extension

Important:

DO Ensure the ceiling structure is capable of holding at least four times the combined weight of the

enclosure and projector. This is a minimum requirement. Follow any local or state codes that apply to

your specific area. We recommend two people and a material lift for this installation.

1.)

Install structural support for sound enclosure unit – utilize 3/8” (M10) threaded rod and

hardware to bolt the unit into place. We recommend using a structural channel above the

unit for lateral positioning of the box.

2.)

Remove access panel(s) to access mount holes (on the 2x2 configuration, one set of mount

holes are accessible at the fan intake). You may also reach in through the projector port for

access.

3.)

Raise the unit up on a material lift to the appropriate vertical height. The seam where the

upper and lower cavities are together in the closed position should be slightly above your

finished ceiling line. Be sure to have a sufficient amount of threaded rod to provide leveling

room. Add hardware as follows for leveling: above unit – nut/lock washer/flat washer;
underside of unit – washer and nut. Do not tighten yet.

Threaded rod
Nut

Flat washer

Split lock washer

Flat washer

Nut

Sound Enclosure