Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 136
Advertising

JT25 Operator’s Manual
Systems and Equipment - 135
Pipe Boxes
CMW
Remove Pipe Box
1.
Install lift block (1) and adjust to match drill frame angle.
2.
Remove pin (3) from top of pipe box.
3.
Remove back pin (2) and two front pins (4).
4.
Replace pin into top of pipe box.
5.
Move pipe box off of drill frame.
Install Pipe Box
1.
Move pipe box over pipeloader and lower into position. En.sure pipe box is moved all the way to the
front.
2.
Install back pin (2) and two front pins (4).
3.
Use pin (3) from top of pipe box to tighten threaded caps.
4.
Replace pin into top of pipe box.
5.
Remove lift block (1).
6.
Raise pipe with lifter on unit.
7.
Remove bottom support pins (3) from both ends of pipe box. Store support pins in holes on top of pipe
box.
Advertising